Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 12, 2025 at 8:00 PM
Updated June 13, 2025
Site work for a civil project in Zephyr Cove, Nevada. Completed plans call for site work for a water / sewer project.
The project consists of constructing eight water service laterals to existing customers located in Marla Bay in the Douglas County Zephyr Water Utility District water system. Question Deadline 06/06/2025 Est. Completion Date: Oct. 15, 2025 Work includes all labor, materials, equipment, services, and documentation necessary to construct the Project defined herein. The Work may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents. B. The Contractor shall complete all Work as specified or indicated in the Contract Documents. The Project is generally described as follows: 1. ZWUD Distribution Improvement Project ñ Marla Bay Service Lateral Replacement Project which consists of constructing eight new water service laterals in the Zephyr Water Utility District water system. 2. The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located at Pharris Lane, Lakeshore Boulevard, and Freel Drive, Zephyr Cove, Nevada.
Award
Water / Sewer
$480,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 11, 2025
Marla Bay, Zephyr Cove, NV
Related To This Project
Zephyr Cove, NV
Bid Date: Jun 18 2025
Zephyr Cove, NV
Bid Date: Oct 06 2021
Zephyr Cove, NV
Bid Date: Jun 10 2025
Zephyr Cove, NV
Bid Date: Jun 06 2025
Zephyr Cove, NV
Bid Date: Nov 16 2020
Zephyr Cove, NV
Bid Date: Apr 30 2024
Zephyr Cove, NV
Bid Date: Sep 06 2022
Round Hill Pines Resort Historic Buildings Stabilization, Lake Tahoe Basin Management Unit - 5158518
Zephyr Cove, NV
Bid Date: Sep 13 2023
Zephyr Cove, NV
Bid Date: Apr 09 2020
Zephyr Cove, NV
Bid Date: Aug 09 2022
Zephyr Cove, NV
--
Zephyr Cove, NV
Bid Date: Mar 24 2022
Zephyr Cove, NV
Bid Date: Dec 13 2022
Las Vegas, NV
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
