Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 29, 2025 at 8:00 PM
Updated May 30, 2025
Renovation of a military facility in New York, New York. Completed plans call for the renovation of a military facility.
AC Replacement Contractor to provide all materials supervision actor to provide all materials supervision actor to provide all materials supervision Any s will be answered by 05/26/2025 The contractor shall provide all tools, material, and labor to replace the outside condensing unit with in kind or compatible unit with existing air handler unit. The contractor has the option of replacing the outdoor condensing unit with two 7.5-ton units with timers and controls to operate in the same manner as the original unit. The exact location will be shown by the Contracting Officer (KO) or Contracting Officer Representative (COR). 1. Replace outdoor condensing unit with in kind or compatible 15-ton unit. 1) Provide rigging services to remove old units from location and place new units. 2) Remove and properly dispose of the existing equipment. 3) Provide all the labor to modify existing gas piping to transition, from existing piping to new systems for proper operation. 4) Provide and install one condenser unit with the following minimum salient characteristics: o 15-ton total capacity o Electrical: 208/230V, 3-phase, 60hz o Coil Coating: Applied anti-corrosion coatings either applied from manufacturer or applied by contractor prior to installation. 5) Connect new equipment to existing copper and condensate piping. 6) Reconnect electrical and refrigerant piping to existing service. 7) Evacuate refrigerant piping system to manufacturer's specifications. 8) Purge with nitrogen. 9) Start-up of system to insure proper operation. 10) Remove and properly dispose of any debris created by the contractor. 2. All work shall be accomplished to code in the specified fields and with the best standard practices. Workman shall be thoroughly experienced and certified in the trades. The work shall be supervised by experienced personnel and shall be satisfactory to the COR. Supervisor contact and qualifications shall be submitted for approval and record. 3. The contractor shall have all materials, equipment, and personnel to perform the work at the prior to the commencement of the work. PERIOD OF PERFORMANCE 1. The overall period of performance shall be no later than 30 after the award date. 2. The contractor may reschedule up to 2 business in case of inclement weather. Scheduling of the date of repair shall be made in best efforts to avoid this. 3. The contractor shall complete all work listed herein within (21) workday(s). 4. Work shall be done between Monday-Friday 0730-1700. The contractor shall give 48 hours' notice to the Contracting Officer or Contracting Officer's Representative if work is needed outside these times for approval. If overtime is needed past 1700 day of repair, the contractor shall notify USCG personnel or designated on personnel by 1430 the day of at the lates
Post-Bid
Military
$50,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 28, 2025
June 27, 2025
To Be Determined, New York, NY
Related To This Project
New York, NY
Bid Date: Jun 05 2025
New York, NY
Bid Date: Jun 10 2025
New York, NY
Bid Date: Jun 13 2025
New York, NY
Bid Date: Jun 11 2025
New York, NY
Bid Date: Jun 06 2025
New York, NY
Bid Date: Jun 02 2025
New York, NY
Bid Date: May 30 2025
New York, NY
Bid Date: Jun 06 2025
New York, NY
Bid Date: Jun 02 2025
New York, NY
Bid Date: Jun 03 2025
New York, NY
Bid Date: Jun 03 2025
New York, NY
Bid Date: Jun 04 2025
New York, NY
Bid Date: Jun 02 2025
New York, NY
--
New York, NY
Bid Date: Jun 05 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed