BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 17, 2025

Site work, paving and outdoor lighting for a mixed-use development in Calipatria, California. Completed plans call for site work for a clubhouse / community center; playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.

Owner wishes to build a Community Park on approximately 3 acres of an empty lot at the Cliff Hatfield Memorial Airport. This park will accommodate a Community Center of approximately 7,000-12,000 sqft, shaded picnic area with barbecue grills, tot-lot playground, a community garden, and amenities such as park lighting, restrooms, walkways, and water fountains. Final Completion December 31st 2027 Contract Execution 6/25/2025 - 7/11/2025 Question Deadline 05/27/2025 at 5:00 PM PT All questions must be received Consultants shall address any issue or question via email to: Chris Larsen (Sr. Project Manager, Gafcon) CLarsen@gafcon.com Pre bid meeting description: A representative from each Respondent that intends to submit an SOQ/Proposal is encouraged to attend an informational virtual meeting with Gafcon. Meeting ID: 247 944 122 615 7 Passcode: X94AT2dS Owner wishes to build a Community Park on approximately 3 acres of an empty lot at the Cliff Hatfield Memorial Airport. This park will accommodate a Community Center of approximately 7,000-12,000 sqft, shaded picnic area with barbecue grills, tot-lot playground, a community garden, and amenities such as park lighting, restrooms, walkways, and water fountains. Preliminary design work was provided by David McCullough, of McCullough Landscape Architecture, who is not precluded from bidding. Construction Cost $5,600,000 to include a Community Center, Splashpad, Playground, BBQ/Picnic and other site amenities. This is the allocated construction cost under the grant scope and successful bidder must come in at or under budget. Pre-Construction Cost $1,400,000 (to include consultants) this cost is controlled by the owner and has the potential of utilization for construction if funds are remaining after design.

Post-Bid

Playgrounds / Parks / Athletic Fields

$5,600,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

March 2, 2026

Project location map

111 N Lake Ave, Calipatria, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.