Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 17, 2025
Site work, paving and outdoor lighting for a mixed-use development in Calipatria, California. Completed plans call for site work for a clubhouse / community center; playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and sidewalk / parking lot.
Owner wishes to build a Community Park on approximately 3 acres of an empty lot at the Cliff Hatfield Memorial Airport. This park will accommodate a Community Center of approximately 7,000-12,000 sqft, shaded picnic area with barbecue grills, tot-lot playground, a community garden, and amenities such as park lighting, restrooms, walkways, and water fountains. Final Completion December 31st 2027 Contract Execution 6/25/2025 - 7/11/2025 Question Deadline 05/27/2025 at 5:00 PM PT All questions must be received Consultants shall address any issue or question via email to: Chris Larsen (Sr. Project Manager, Gafcon) CLarsen@gafcon.com Pre bid meeting description: A representative from each Respondent that intends to submit an SOQ/Proposal is encouraged to attend an informational virtual meeting with Gafcon. Meeting ID: 247 944 122 615 7 Passcode: X94AT2dS Owner wishes to build a Community Park on approximately 3 acres of an empty lot at the Cliff Hatfield Memorial Airport. This park will accommodate a Community Center of approximately 7,000-12,000 sqft, shaded picnic area with barbecue grills, tot-lot playground, a community garden, and amenities such as park lighting, restrooms, walkways, and water fountains. Preliminary design work was provided by David McCullough, of McCullough Landscape Architecture, who is not precluded from bidding. Construction Cost $5,600,000 to include a Community Center, Splashpad, Playground, BBQ/Picnic and other site amenities. This is the allocated construction cost under the grant scope and successful bidder must come in at or under budget. Pre-Construction Cost $1,400,000 (to include consultants) this cost is controlled by the owner and has the potential of utilization for construction if funds are remaining after design.
Post-Bid
Playgrounds / Parks / Athletic Fields
$5,600,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
March 2, 2026
111 N Lake Ave, Calipatria, CA
Related To This Project
Calipatria, CA
Bid Date: Sep 10 2025
Calipatria, CA
--
Calipatria, CA
Bid Date: Sep 16 2025
Calipatria, CA
Bid Date: Nov 04 2025
Calipatria, CA
Bid Date: Mar 19 2026
Calipatria, CA
Bid Date: Sep 11 2025
Calipatria, CA
Bid Date: Apr 29 2025
Calipatria, CA
Bid Date: Apr 25 2025
Calipatria, CA
Bid Date: Aug 20 2024
Calipatria, CA
--
Calipatria, CA
--
Calipatria, CA
Bid Date: Feb 17 2022
Calipatria, CA
--
Calipatria, CA
Bid Date: Sep 21 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
