Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 11, 2025 at 8:00 PM
Updated June 12, 2025
Site work and paving for a civil project in Solon Springs, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The Village Board is now accepting sealed bids for the following Asphaltic pulverize and pave for the following project: Segment 1. Mertzig Parkway - approx. 0.48 miles. 22ft wide, Blacktop, 3.5" thick, 22' wide x 0.48 miles long. Pulverize the existing asphalt and pave 3.5 inches of hot mix in 2 lifts. Approx 57,233 SF. Segment 2. E. Boundary Ave approx. 0.48 miles. 20ft wide, Blacktop 3.5" thick, 20' wide x 0.48 miles long. Approx. 53,390 SF. Specifications included in both segments pulverize entirely and pave 2 lifts on each segment at 3.5 inches total. Compacted thickness of mix type E-1 or E-0.3 including adjustment and lifts of all manholes. Include tack quote quantities. Quote to include price per unit and estimated tonnage of hot mix asphalt. Shouldering 2 ft wide of 34 gravel on both segments 1 and 2, 2 ft wide. 1. Place base along Mertzig Parkway for pavement widening of 2 ft. 2. Pulverize the existing blacktop and grade pulverized material to proper slope. 3. Fine grade, water and compact the base to prepare for placement of hot mix asphalt. 4. Pave with hot mix asphalt to a uniform 3.5 thickness through entire project in 2 lifts. 5. Construct 2 ft gravel shoulders of gravel on both segments all shoulders to be compacted by contractor. 6. Include tack oil gallons for each segment in the bid. 7. Include asphalt tonnage in bid for each segment. 8. Adjustment and lifts of all manholes. 9. Match existing manholes or rise if needed, work with Village of Solon Springs for any risers. 10. Contractor to provide all traffic control meeting MUTCD guidelines. All projects shall be completed by October 15, 2025. Liquid damages to Start Oct 16th 2025 for not meeting the October 15th 2025 completion date. Bids shall include costs for each project separately and a total price for both projects combined. Segments 1, Segment 2, and Combined total. A map of segment is attached to this document. All questions can be sent to The Villager of Solon Springs 715- 378-2235. Awarded contractor to coordinate with the Village of Solon Springs streets department before proceeding, all daily communications and final inspections. All contracting procedures work, and materials supplied under this proposal shall conform to the Standard Specifications for Highway and Structure Construction, 2015 edition, and all subsequent revisions and supplementary specifications, of the Wisconsin Division of Highways, Department of Transportation. The Village Board reserves the right to accept or reject any or all bids or to award the bid that is most advantageous to the Village of Solon Springs.
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
July 10, 2025
Multiple Locations, Solon Springs, WI
Related To This Project
Solon Springs, WI
Bid Date: Aug 18 2025
Solon Springs, WI
Bid Date: Apr 12 2021
Solon Springs, WI
--
Solon Springs, WI
--
Solon Springs, WI
--
Solon Springs, WI
--
Solon Springs, WI
Bid Date: Jan 15 2026
Solon Springs, WI
Bid Date: Feb 04 2026
Solon Springs, WI
Bid Date: Jun 05 2025
Solon Springs, WI
--
Solon Springs, WI
Bid Date: Jul 12 2024
Solon Springs, WI
Bid Date: Apr 26 2024
Solon Springs, WI
Bid Date: May 14 2024
Solon Springs, WI
Bid Date: Aug 21 2023
Solon Springs, WI
Bid Date: Aug 21 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
