Published June 16, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a civil project in Big Bear City, California. Completed plans call for site work for a road / highway; and water / sewer project.

SCOPE OF CONTRACT: The purpose of this project is to replace guardrail burned by the Line Fire and to replace and repair overside drains that were damaged during Line Fire suppression efforts on the San Bernardino National Forest, Front Country and Mountaintop Ranger Districts. This contract provides for the equipment, labor, and services necessary to perform work ordered by the Government for installing 205 feet of guardrail, installing and removing 21 corrugated metal spillways, and resetting 3 corrugated metal spillways in compliance with the terms, specifications, drawings and provisions of this contract. Locations of work will be directed by the Forest Service. The contractor shall provide all labor, materials, equipment, permits, testing, incidentals, and supervision to perform the requirements of this SOW and associated task order award. This project task order contract shall include the terms and conditions of the base IDIQ contract and supplemented by any project-specific requirements/attachments. Existing contract clauses may be supplemented and new contract clauses may be added. All work will be performed in accordance with contract and applicable regulatory requirements. PROJECT LOCATION: The project location is in multiple locations on the Front Country and Mountaintop Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky. PERIOD OF PERFORMANCE: Projected start date: June 18, 2025. Time for completion: 105 calendar from the issuance of the Notice to Proceed. REQUIREMENTS: The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities to perform the Statement of Work/Specifications referenced below. The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur. The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment. The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation. The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment. The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly. The Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day. The Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands. The Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest. SPECIFICATIONS: A.FHWA Standard Specification 2024 B.Forest Service Supplemental Specifications [FSSS]. Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. U.S. Customary Units and Forest Service Supplemental Specifications (FSSS). FP-14 and Caltrans Specs where applicable. Electronic copy can be downloaded at: https://highways.dot.gov/federal-lands/specs/fp-24 The following standard Forest Service specifications are included as a part of this contract: 840-2 Install 840-2a 18 Inch Detal San Bernardino National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisors Office. IAW FAR 36.204, disclosed magnitude of construction cost is between 25,000 and 100,000. NAICS CODE: 237310, Highway Street Bridge Construction, 45M SOLICITATION NO. 127EAW25R0031 DAVIS-BACON WAGES APPLY BONDS ARE FOR PROJECTS WITH A VALUE OF 35,000.00 AND ABOVE *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$100,000.00

Public - Federal

Site Work

6

12

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
436
Active Projects
223
Bidding Soon
1,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

June 25, 2025

Project location map

Multiple Locations, Big Bear City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.