Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work for a water / sewer project in Porterville, California. Completed plans call for site work for a water / sewer project.
Well No. 34, a municipal water well, with a deep well vertical turbine pump, motor, discharge piping, electrical and controls, SCADA system, diesel generator, shade structure, building, site grading and drainage, conveyance piping, hydropneumatic tank, appurtenances, site development, and all other items or details not mentioned above that are required by typical construction or Standard Specifications. A Certified Check, Cashier's Check, or Bidder's Bond in the amount of ten percent (10%) of the bid made payable to the City of Porterville will be required to accompany each proposal. A minimum DBE participation has not been set for this project however, all bidders must comply with the DBE provisions of this project and required to seek, and encouraged to use, DBEs for their procurement needs. Recipients should award a "fair share" of the sub-agreements to DBEs. The right is reserved by the City of Porterville to reject any or all bids, to evaluate the bids submitted and to award the contract according to the proposal which best serves the interests of said City. The successful bidder will be required to furnish the City of Porterville with a "Performance Bond" in the amount of one hundred percent (100%) of the contract and a "Labor and Materials Bond" in the amount of one hundred percent (100%) of the contract amount. Upon receiving the "NOTICE OF AWARD," the successful bidder has TEN (10) DAYS to submit the signed contract together with all required bonds, insurance and licenses to the Project Manager, and meet with the City in a PRE-CONSTRUCTION MEETING to discuss any problems or questions pertaining to this project. It is the Contractor's responsibility to contact the City's Project Manager immediately, to arrange for the PRE-CONSTRUCTION MEETING during the TEN (10) DAY PERIOD. The Contractor shall have fifty (50) working days from the effective date of the NOTICE TO PROCEED to complete the required work.
Award
Water / Sewer
$3,863,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2025
August 18, 2025
To Be Determined, Porterville, CA
Related To This Project
Porterville, CA
Bid Date: Jun 11 2025
Porterville, CA
Bid Date: Jun 05 2025
Porterville, CA
Bid Date: Jul 07 2025
Porterville, CA
Bid Date: Aug 22 2025
Porterville, CA
--
Porterville, CA
--
Porterville, CA
--
Porterville, CA
Bid Date: Oct 21 2025
Porterville, CA
Bid Date: Jun 17 2025
Porterville, CA
Bid Date: Jun 04 2025
Porterville, CA
Bid Date: Jun 05 2025
Porterville, CA
Bid Date: Jun 03 2025
Porterville, CA
Bid Date: May 22 2025
Porterville, CA
Bid Date: Apr 30 2025
Porterville, CA
Bid Date: May 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
