BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Site work for a water / sewer project in Marion, Alabama. Completed plans call for site work for a water / sewer project.

The Project Consists of the Extension of a Potable Water Main Along Al Hwy 183 With Service Installations, Fire Hydrants and Related Appurtenances in Perry County, Al. The Contract Documents and Plans May Be Examined at the Office of Perry County Water Authority, Marion, Al; at the Office of Goodwyn Mills Cawood, Llc. All Bidders Must Comply With the Presidents Executive Order Number 11246 Which Prohibits Discrimination in Employment Regarding Race, Color, Religion, Sex, Sexual Orientation, Gender Identity, or National Origin. All Bidders Must Comply With Title Vi of the Civil Rights Act of 1964, the Davis-bacon Act, the Anti-kickback Act and the Contract Workhours Act. The Attention of Bidders is Particularly Called to the Requirements as to Conditions of Employment to Be Observed and Minimum Wage Rates to Be Paid Under the Contract, Section 3, Segregated Facilities, Section 109 and E.o. 11246. The Owner Reserves the Right to Waive Any Informalities, or to Reject Any or All Bids, and to Award the Contract to the Lowest, Most Responsive and Responsible Bidder. All Bidders Must Comply With Requirements of the Contractor's Licensing Law of the State of Alabama and Be Certified for the Type of Work on Which the Proposal is Submitted. Each Bidder Must Deposit With His Bid, Security in the Amount of, Form of and Subject to the Conditions Provided in the Information for Bidders. All Contractors Preparing Bids for the Referenced Project Shall Submit a List of Similar Projects Successfully Completed in the Last 5 Years, Having the Same Scope of Work With Construction Cost Similar to or Greater Than This Project. All Nonresident Contractors Preparing Bids Shall Submit With the Bid Documents Evidence of a Current Alabama General Contractors License, Evidence (With Original Seal of the State of Alabama) of Proper Registration With the Alabama Secretary of State as a Foreign Corporation, and a Certificate of Good Standing as a Foreign Corporation From the State of Alabama Department of Revenue. Bids Submitted by a Nonresident Contractor Without These Documents Included Will Be Rejected. This Project is Being Funded in Part by Srf Project No: Fs010358-01 and Will Require Dbe Documentation From the Low, Responsive, Responsible Bidder No Later Than 10 Days After the Bid Opening. All Participants Must Comply With All Federal Requirements Applicable to the Loan (Including Those Imposed by the 2014 Appropriations Act and Related Srf Policy Guidelines) Which the Participant Understands Includes, Among Other, Requirements That All of the Iron and Steel Products Used in the Project Are to Be Produced in the United States (American Iron and Steel Requirement) and Those Imposed by the Build America, Buy America (Baba) Requirements. Guarantee Will Be Required With Each Bid for at Least 5% of the Amount of the Bid Filed in the Form of a Certified Check, Bid Bond, or Irrevocable Letter of Credit Acceptable to the Owner Payable to the Perry County Water Authority. Bid Bonds Shall Include Certification That the Bonding Company is Listed in Circular 570 of the U.s. Treasury Department. The Name, Address, Telephone Number, and Contact Person for the Bonding Company Shall Also Be Included. No Bidder May Withdraw His Bid Within 60 Days After the Opening Thereof. Bids May Be Held by the Owner for a Period Not to Exceed Sixty (60) Days From the Date of Opening of Bids for the Purpose of Reviewing the Bids and Investigating the Qualifications of the Bidders Prior to Awarding the Contract. This Project is Being Funded in Part by Cdbg Project No. Cycm-pf-21-004. The Successful Bidder Will Be Required to Submit 100% Performance and Payment Bonds or an Irrevocable "Letter of Credit" Which is Acceptable to the Owner. All Bonds and Letters of Credit Shall Be for 100% of the Contract Price. Attention of Bidders is Called to the License Required by Title 34, Chapter 8, of the Code of Alabama, 1975, and Amendments Thereto, Relating to the Licensing of General Contractors. No Bid Will Be Accepted From Anyone, Except a Qualified Contractor, Licensed by the State Licensing Board for General Contractors, Unless Otherwise Required by the State Licensing Board. Bid submission info : All Bids Shall Be Submitted in a Sealed Envelope Bearing on the Outside the Name of the Bidder, Bidders License Number, License Expiration Date, Category, Address and Name of the Project. Envelopes Containing Bids Must Be Addressed as Follows, and Delivered to Mr. Earl Ford, Chairman, 108 W. Monroe Street or P. O. Box 485, Marion, Al 36756: Bid for Dwsrf Alabama Highway 183 Water Main Extension Srf Project No. Fs010358-01 Cdbg Project No. Cycm-pf-21-004. Bidders Will Be Fully Responsible for the Delivery of Their Bids in a Timely Manner. Reliance Upon U.s. Mail or Other Carriers is at the Bidders Risk. Late Bids Will Not Be Considered. The Perry County Water Authority is an Equal Opportunity Employer and Encourages the Participation of Women and Minority Owned Businesses (Ombes) and Section 3 Qualified Contractors in All Project Contract Procurements. Document info : No Documents Will Be Issued Within 48 Hours Prior to Bid Opening.

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
61
Bidding Soon
748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

AL-183, Marion, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.