BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2025 at 8:00 PM

Updated August 16, 2025

Site work and new construction of a service station / car wash facility in San Antonio, Texas. Completed plans call for the construction of a service station / car wash facility; and for site work for a service station / car wash facility.

**As of August 15th 2025 this project has not yet been awarded. Additional information will be available following the September 2025 SAWS Board meeting. Sealed proposals are requested by the San Antonio Water System for improvements at the East Side Operations Center. Work includes construction of a new fueling facility (diesel and gas), new oil collection system, CMU ice and water station, relocation and repurposing of two (2) diesel emergency generators, electrical components, and associated civil site improvements for the East Side Operations Center Fuel Facility, SAWS Job Nos. 22-7710 & 22-7711. Electronic proposals shall be accompanied by a bid bond in an amount not less than five percent of the total proposal price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total proposal price, SAWS will request this within 24 hours from the Respondent who did not submit a bid bond). Question Deadline 06/20/2025 at 4:00 PM CT For questions regarding this solicitation, technical questions, or additional information, please contact Stephen Muñiz, Contract Administrator, in writing via email to stephen.muniz@saws.org. Answers to the questions will be posted to the web site by 4:00 PM (CDT) on July 1, 2025, as a separate document or included as part of an addendum. SBOP Goal for this project is 17%. This Summary of Work is included as part of this Solicitation to provide a general basis for Respondentsto determine what isreasonably comparable. The work consists of, but not limited to, the following: o Demolition of: Two (2) underground fuel storage tanks (USTs) One (1) underground used oil storage tank (UST) Fuel islands and associated appurtenances. o Removal and replacement of: Curb and asphalt pavement to create area for a relocated 900 kW generator. Asphalt pavement surrounding new Ice/Water Station. Multiple small areas of concrete and asphalt pavements. o Relocation, construction of new concrete pads, and installation of: Existing 900 kW generator from SAWS Aqua Vista Pump Station (20015 Hardy Oak Blvd.) Existing 500 kW generator from on-site at Eastside Operations Center and salvaged electrical appurtenances from Aqua Vista Pump Station. o New CMU building for Ice and Water Station o New Fueling Facility (diesel and gasoline): Concrete pavement. Containment facility with four (4) 10,000-gallon ASTs. Four (4) fuel pump islands. Canopy over Islands. o New 500-gallon used oil AST and the rerouting of existing piping from central pump within the existing Fleet Maintenance building. New underground utilities: Electric ductbanks 8 and 2-inch Water Mains. 4-inch sanitary sewer lateral Relocation of existing underground utilities: Electric ductbanks 4-inch Gas main Striping of parking space

Post-Bid

Service Station / Car Wash

$8,500,000.00

Public - City

New Construction, Site Work

100

30

37

9

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
116
Bidding Soon
2,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

September 24, 2025

Project location map

403 S WW White Rd, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.