Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 16, 2025 at 8:00 PM
Updated June 17, 2025
Site work and paving for a road / highway in Bartlett, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Description: The project includes the realignment of Oak Avenue from Hickory Avenue north to Bartlett Avenue off Lake Street (US Route 20). The estimated length of the roadway is approximately .35 miles and will require utility coordination and potential relocation. The land the proposed realignment is on is in a newly established Tax-Increment Financing (TIF) District and a section is owned by IDOT and another section is private property. IDOT has instructed the Village to initiate Phase I. A concept from IDOT for the realignment from 2017 is included for reference. The Village funding of this project will be paid for using MFT funds, and any future additional funding. Therefore, all plans, specifications, project documentation and construction practices shall adhere to the guidelines set forth by IDOT for federal aid projects. Timeline: The goal is to begin Phase I during FY 25/26 and go through the IDOT process and continue into Phase II engineering once IDOT approves Phase I. Scope of Services The awarded firm shall be responsible for engineering services necessary to oversee the successful completion of the above project. This work may include, but not be limited to: o Providing contract management - including coordination with IDOT, utilities, and outside agencies. o Providing survey work, including all utilities. o Providing an estimated construction timeline. o Providing Phase I conceptual designs. o Assistance with Grant funding applications and reporting (if applicable). o Preparation of Phase II plans and specifications and estimate for the work required. o Permitting assistance if required - anticipated IEPA and IDOT permits at a minimum o Assistance in bidding preparation and bid review. o Potential Additional Services may also include: o Coordinating meetings with residents/businesses to obtain construction easements o Wetland delineation and report SOI Submittal Requirements*: The following information shall be included to help the Village of Bartlett select a consultant(s) for the above referenced project(s). o Name, contact person, address and brief history of firm. o Project(s) that the firm is submitting the SOI for. o Names and resumes (limit each individual resume to one (1) page) of the key staff to be assigned to this project. o Related experience during the last five (5) years by the proposed staff. o Project understanding/approach and Critical Project Components o Information that would differentiate your firm from others. *The SOI shall be no more than five (5) double-sided pages. This does not include the resumes attached. Any questions shall be submitted to Tyler Isham AND Dan Dinges on or before 4:00 PM on Friday, June 13, 2025. A response to all written questions will be provided no later than 3:30 PM on Tuesday, June 17, 2025. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2026
Oak Ave, Bartlett, IL
Related To This Project
Bartlett, IL
Bid Date: Jun 18 2025
Bartlett, IL
Bid Date: Jul 01 2025
Bartlett, IL
Bid Date: Jul 24 2025
Bartlett, IL
Bid Date: Jul 31 2025
Bartlett, IL
Bid Date: Sep 25 2025
Bartlett, IL
Bid Date: Oct 09 2025
Bartlett, IL
--
Bartlett, IL
Bid Date: Jan 27 2026
Bartlett, IL
Bid Date: Jun 11 2025
Bartlett, IL
Bid Date: Jun 10 2025
Bartlett, IL
Bid Date: Apr 25 2025
Bartlett, IL
Bid Date: Apr 25 2025
Bartlett, IL
Bid Date: Mar 12 2025
Bartlett, IL
Bid Date: Mar 06 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
