Published June 16, 2025 at 8:00 PM

Updated June 17, 2025

Site work and paving for a road / highway in Bartlett, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Description: The project includes the realignment of Oak Avenue from Hickory Avenue north to Bartlett Avenue off Lake Street (US Route 20). The estimated length of the roadway is approximately .35 miles and will require utility coordination and potential relocation. The land the proposed realignment is on is in a newly established Tax-Increment Financing (TIF) District and a section is owned by IDOT and another section is private property. IDOT has instructed the Village to initiate Phase I. A concept from IDOT for the realignment from 2017 is included for reference. The Village funding of this project will be paid for using MFT funds, and any future additional funding. Therefore, all plans, specifications, project documentation and construction practices shall adhere to the guidelines set forth by IDOT for federal aid projects. Timeline: The goal is to begin Phase I during FY 25/26 and go through the IDOT process and continue into Phase II engineering once IDOT approves Phase I. Scope of Services The awarded firm shall be responsible for engineering services necessary to oversee the successful completion of the above project. This work may include, but not be limited to: o Providing contract management - including coordination with IDOT, utilities, and outside agencies. o Providing survey work, including all utilities. o Providing an estimated construction timeline. o Providing Phase I conceptual designs. o Assistance with Grant funding applications and reporting (if applicable). o Preparation of Phase II plans and specifications and estimate for the work required. o Permitting assistance if required - anticipated IEPA and IDOT permits at a minimum o Assistance in bidding preparation and bid review. o Potential Additional Services may also include: o Coordinating meetings with residents/businesses to obtain construction easements o Wetland delineation and report SOI Submittal Requirements*: The following information shall be included to help the Village of Bartlett select a consultant(s) for the above referenced project(s). o Name, contact person, address and brief history of firm. o Project(s) that the firm is submitting the SOI for. o Names and resumes (limit each individual resume to one (1) page) of the key staff to be assigned to this project. o Related experience during the last five (5) years by the proposed staff. o Project understanding/approach and Critical Project Components o Information that would differentiate your firm from others. *The SOI shall be no more than five (5) double-sided pages. This does not include the resumes attached. Any questions shall be submitted to Tyler Isham AND Dan Dinges on or before 4:00 PM on Friday, June 13, 2025. A response to all written questions will be provided no later than 3:30 PM on Tuesday, June 17, 2025. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
755
Active Projects
416
Bidding Soon
3,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2026

Project location map

Oak Ave, Bartlett, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.