Published October 2, 2025 at 8:00 PM

Updated October 3, 2025

Site work and new construction of a mixed-use development in Pensacola, Florida. Working plans call for the construction of a 126,000-square-foot stadium; for site work for a stadium; 108,000-square-foot, four-room educational facility; and educational facility.

As of October 2, 2025, the owner has selected a construction manager. Information regarding the architect has not been disclosed. The construction timeline has not been set. The RFQ follows below. _______________________________________________________________________________ Reference Number 0000388307 The University of West Florida Board of Trustees invites firms to submit qualifications for Construction Manager at Risk preconstruction & construction services for the new Stadium and Residence Hall on the Pensacola Main Campus. Project Description: Stadium The planned multi-phase facility is anticipated to have an initial seating capacity of 7,500 total seats. This is to include fixed seating and flexible seating (i.e.: berm, standing room only, social spaces). The new Stadium construction will comprise approximately 126,000 GSF (gross square feet). It will be located adjacent to, and connect with, the new UWF Residence Hall, which is planned to be constructed concurrently and immediately north of the Stadium. The new facility is intended to host University of West Florida football games and a variety of academic, student, and community activities. This new permanent multipurpose expandable facility will be built around the existing football artificial turf field and will replace the current temporary 6,500 spectator capacity facility. The temporary facility includes 3,650 fixed seats including chairback bleacher seats on the home sideline (1,804) and bleacher bench seating on the visitor sideline (1,846), open grass spaces for expanded seating, temporary concession options offered at food trucks, and temporary bathroom facilities, among other features. The overall project scope will include relocation of the temporary bleacher seating. Project Description: Residence Hall The new Residence Hall construction will comprise approximately 108,000 GSF (gross square feet). The Residence Hall shall be laid out in suites to accommodate 250-300 students. The preferred design will be based on a 4-bedroom suite concept incorporating four (4) student bedrooms per suite, with two (2) shared baths, and a common area available to each suite for social interaction. The Residence Hall is to include resident advisor 1-bedroom suites (typically 2 per floor), and one (1) resident director 2-bedroom apartment (for full time professional staff member). Student suite kitchenette amenities will be limited to microwave, and refrigerator. Question Deadline 06/25/2025 at 10:00 AM CT Questions are submitted online Yes , The Procurement and Contracts Representative and sole point of contact for this solicitation is: Cassie Boatwright, Director, Email: cboatwright@uwf.edu Budget: Stadium The preliminary programming estimate of the new multipurpose Stadium facility will be an approximately 126,000 GSF structure with an estimated construction cost of approximately $35 million. The total project budget in addition to building construction, site improvements, and utilities, additionally includes all other soft project costs such as Design Professional fees, other consultant fees, surveys, testing, permitting, inspections, building commissioning, F.F.E. (Furniture, Fixtures, Equipment), contingencies, etc. The full scope of the work is subject to available funding. Funding is anticipated to include multiple funding sources. Budget: Residence Hall The preliminary programming estimate of the new Residence Hall will be an approximately 108,000 GSF structure with an estimated construction cost of $38.5 million. The total project budget includes, in addition to building construction, site improvements, and utilities, all other soft project costs such as Design Professional fees, other consultant fees, surveys, testing, permitting, inspections, building commissioning, F.F.E. (Furniture, Fixtures, Equipment), contingencies, etc. The full scope of the work is subject to available funding. Funding may include multiple funding sources, and this may include bonding the construction.

Pre-Construction/Negotiated

Arenas / Stadiums

$73,500,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
48
Bidding Soon
754
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

June 29, 2026

Project location map

11000 University Pkwy, Pensacola, FL

Related To This Project