Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2025 at 8:00 PM

Updated August 9, 2025

Site work and new construction of a mixed-use development in Keene, New Hampshire. Conceptual plans call for site work for a playground / park / athletic field; for the construction of a power facility; and power facility.

The City of Keene is soliciting qualifications from qualified engineering consulting firms to provide design, permitting, bid-phase, and limited construction phase services for a proposed 30-foot by 230-foot hybrid timber multi purpose pavilion with integrated photovoltaic (PV) solar array, to be located along Gilbo Avenue in Downtown Keene, New Hampshire. The proposed project is being funded in part by the Northern Border Regional Commission (NBRC) through its Timber for Transit Program. The method of Contractor Selection has not been Determined at this time.

Conceptual

Solar Power Generation

$250,000.00

Public - City

New Construction, Site Work

26

4

2

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
718
Active Projects
313
Bidding Soon
4,842
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed