BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a water / sewer project in Amarillo, Texas. Completed plans call for site work for a water / sewer project.

Replace Power Inverter Combined Pump Station #16 Questions Due Date: Jun 9th 2025, 5:00 PM CDT The City of Amarillo (City) is soliciting a Request for Bid from respondents who are interested in and qualified for REPLACE POWER INVERTER COMBINED PUMP STATION #16. It is the intent of the City to award this bid based on the Bidder that can provide the goods or services at the Best Value to the City of Amarillo. The estimated budget for the project is $263,338.00 This specification covers all material and labor required for purchase and delivery of: Power pole inverter based off the FLA of the drive and if the drive is constant torque or variable torque. All the necessary back plane connections to the new power pole inverter. Medium voltage cables and lugs per the FLA for installation purposes. Frame to include new back stab portion included with the new power pole inverter. New inverter fan bracket and fans based on frame size. Floating neutral 6 RTD (EP 1.1). Three temperature points (EP 1.0 inverters 2015-no control adjustments). New inverter cart for shipments. NewSC9KIT-761. New MIC/SIC flashed to 1.7. PCB power supply. All necessary Turck I/O components. Drawing updates. EP 1.1 and above. Phases U.V.W, RTD SP1. INV stabilizer assembly 36W. Consent for disposal provided by City of Amarillo in written form. Must meet OEM original equipment specifications and manufacturers updated recommendations.

Award

Water / Sewer

$263,338.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 18, 2025

Project location map

To Be Determined, Amarillo, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.