Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Renovation of a museum in Temple, Texas. Working plans call for the renovation of a 5,962-square-foot, two-story above grade museum.
As of 9/9/2025, this project has been canceled. It is the City's intent to rebid this project in the future. Question Deadline 06/10/2025 at 12:00 PM CT Deadline for Questions related to ITB Submit questions in writing through the Bonfire online bidding portal or email to purchasing@templetx.gov. Project Description: Abatement of approximately 5,962 sf of asbestos-containing floor tile on the 1st & 2nd floors of the City's Historic Post Office located Work expected to be done July 2025, contingent upon availability of electricity & water. a. The awarded contractor shall notify the City of Temple project manager before the start of the abatement activities to verify the proper scope of work. b. The awarded contractor will have access to the building's existing water and electricity for the asbestos abatement activities. c. The asbestos-containing materials must be removed and properly disposed of by an accredited asbestos abatement contractor. d. Specifications for the asbestos abatement activities including property location, internal building map, and photographs are provided in the Building Survey Report for AsbestosContaining Materials (ACBM) (separate Attachment 6.3.) and Asbestos Abatement Project Design (separate Attachment 6.4). e. As reflected in the Asbestos Abatement Project Design, the abatement work consists of the abatement of approximately 5,962 sf of asbestos containing floor tile and black mastic located under the carpet, floor laminate, and ceramic flooring. 3,611 sf of asbestos containing floor tile and black mastic has been identified on the 1st floor and 2,351 sf on the 2nd floor. f. The Asbestos Abatement Project Design requires onsite air monitoring during the abatement process. Air monitoring services will be provided by Austin Environmental, Inc and be funded by the City for a maximum of 8 days. the question deadline has been extended to Thursday, August 7, 2025, at 12:00pm
Final Planning
Museum
$25,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
March 26, 2026
101 N Main St, Temple, TX
Related To This Project
Temple, TX
Bid Date: Jun 18 2025
Temple, TX
Bid Date: Jun 18 2025
Temple, TX
Bid Date: Jun 25 2025
Temple, TX
Bid Date: Jun 26 2025
Temple, TX
--
Temple, TX
Bid Date: Jun 17 2025
Temple, TX
--
Temple, TX
--
Temple, TX
Bid Date: Jun 17 2025
Temple, TX
Bid Date: Jun 17 2025
Temple, TX
Bid Date: Apr 15 2025
Temple, TX
Bid Date: Jun 20 2025
Temple, TX
Bid Date: May 27 2025
Temple, TX
Bid Date: Dec 17 2025
Temple, TX
Bid Date: Sep 02 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
