Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work and paving for a civil project in Spirit Lake, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

: Work generally consists of infrastructure improvements for single-family residential development which includes, but is not limited to: - Clearing & Grubbing - Grading, Excavation, Subgrade Preparation, and Modified Subbase- 7" PCC Roadway - Storm Sewer, Sanitary Sewer Main, Water Main - Sanitary and Water Services - Erosion Control Items - Conventional Seeding - Temporary Traffic Control Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. The right to accept or reject any or all bids and to waive informalities is reserved. The work shall be completed as follows: All excavation, removals, underground utilities, erosion control, and temporary stabilization operations shall be substantially completed by November 28, 2025. All subbase, paving, seeding operations shall be substantially completed by May 29, 2026. Site Directions: Located at the intersection of 36th Street and Jolly Court on the north side of the road, Spirit Lake, Iowa.

Bid Results

Roads / Highways

$1,820,794.00

Public - City

Paving, Site Work

95

13

2

5

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
48
Bidding Soon
458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 17, 2025

Project location map

36th St & Jolly Ct, Spirit Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.