Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2025 at 8:00 PM
Updated March 21, 2025
Site work and paving for a mixed-use development in Spirit Lake, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Work to Be Done: Work generally consists of approximately 2,160 linear feet of road reconstruction to include, but not limited to: - Pavement Removal - Excavation, Special Compaction of Subgrade, Modified Subase - Sanitary Sewer, Storm Sewer, Water Main Removal - Sanitary Sewer, Storm Sewer, Water Main Installation - Sanitary Sewer and Water Services - 6” Subdrain - 5” PCC Sidewalk, 6” PCC Driveways and Parking, 7” PCC Roadway - Temporary Traffic Control - Erosion Control Items - Seeding See Bid Form for exact quantities Site Directions: From the intersection of 23rd Street and Hill Avenue to the intersection of 23rd Street and Chicago Avenue, Spirit Lake, Iowa Bid security shall be provided in the form of a cashier’s check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked “bid bond”. The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor The work shall be completed as follows: All work shall be substantially completed within 80 working days once commencedPhase 1 (Hill Avenue to Erie Avenue) shall be completed by August 15, 2025 regardless of working days used. Phase 2 (Erie Avenue to Chicago Avenue) shall be completed by October 31, 2025 regardless of working days used. The right to accept or reject any or all bids and to waive informalities is reserved.
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
May 19, 2025
23rd St, Spirit Lake, IA
Related To This Project
Spirit Lake, IA
Bid Date: Apr 03 2025
Spirit Lake, IA
--
Spirit Lake, IA
Bid Date: Apr 22 2025
Spirit Lake, IA
Bid Date: May 20 2025
Spirit Lake, IA
Bid Date: Jun 19 2025
Spirit Lake, IA
Bid Date: Jun 17 2025
Spirit Lake, IA
Bid Date: Jun 17 2025
Spirit Lake, IA
Bid Date: Jul 01 2025
Spirit Lake, IA
Bid Date: Mar 10 2025
Spirit Lake, IA
Bid Date: Feb 06 2025
Spirit Lake, IA
Bid Date: Dec 18 2024
Spirit Lake, IA
Bid Date: Sep 05 2024
Spirit Lake, IA
Bid Date: Aug 22 2024
Spirit Lake, IA
--
Spirit Lake, IA
Bid Date: Mar 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
