Published February 13, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a road / highway in Spirit Lake, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Work to Be Done: Work generally consists of median improvements which include, but are not limited to: - Pavement Removal - Earthwork, Subgrade Preparation, and Modified Subbase - Full Depth PCC Patch - Pavers - Hardwood Mulch - Conventional Seeding - Erosion Control See Bid Form for exact quantities Site Directions: DIVISION I: HILL AVENUE, APPROXIMATELY 30TH STREET TO 19TH STREET DIVISION II: HILL AVENUE, APPROXIMATELY 15TH STREET TO 8TH STREET SPIRIT LAKE, IOWA Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. Work shall commence no sooner than June 2, 2025. Work shall be substantially completed within 20 working days once commenced. All work shall be completed by August 1, 2025 regardless of working days used. Division II: Work shall be substantially completed within 20 working days once commenced. All work shall be completed by August 1, 2025 regardless of working days used. The right to accept or reject any or all bids and to waive informalities is reserved. Question Deadline 01/30/2025

Award

Roads / Highways

$550,889.00

Public - City

Paving, Site Work

64

11

10

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
48
Bidding Soon
458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

June 2, 2025

Project location map

Multiple Locations, Spirit Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.