Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated July 2, 2025
Site work and outdoor lighting for a water / sewer project in Miami, Florida. Completed plans call for site work for a water / sewer project; and for outdoor lighting for a water / sewer project.
All capital departments are participating. Additional opportunities are available through Weatherization Assistance Program (WAP) which enables low-income families to reduce their energy bills by making their homes more energy efficient. Funds are used to improve the energy performance of dwellings by families in need, using the most advanced technologies and testing procedures available in the housing industry. Measures to make homes more energy efficient include: replacement or installation of key components, installation of energy recovery ventilation systems including bathroom and kitchen exhaust fans and installation of whole mechanical exhaust systems to provide better indoor air quality, install attic insulation, install window solar films, repair or replace inefficient cooling units, repair or replace water heaters and address air infiltration with weather stripping, caulking thresholds, minor wall repairs, ceiling and floors, windows and doors. SBE- Service: 1% The Contractor shall furnish all materials, labor, services, supervision, tools, equipment, and all other items for the construction and installation High-Mast LED fixtures and associated work, located at Miami-Dade County Seaport Department. The Work of this Contract comprises the design and general construction necessary to retrofit existing high masts #10, #17, #40, #42, #55 (POMTOC yard); #14, #60, #69, #201, #210A and #210B (Seaboard yard); #63 (Shed E, Customs and Border Protection, "CBP"); and #R19 (SB HM#19), as indicated on plans. All work shall be completed in accordance with the Contract Documents. Experience: The Prime Contractor, Sub-contractor and/or Key Personnel must have successfully completed the construction and/or retrofit of a minimum of three (3) High Mast and/or Roadway lighting within the last ten (10) years; one (1) project within the last five (5) years Calendar Days for Project Completion: 450 Question Deadline 06/16/2025 at 12:00 PM ET Please contact Frank Ramirez Phone No: (305) 347-5508 Email: Frank.Ramirez@miamidade.gov. Addendums - RFIS All requests for clarification of an RPQ must be submitted in writing, Written communications must be in the form of an e-mail addressed to Ivonne Andres at sprfi@miamidade.gov with a copy to the Clerk of the Board at clerkbcc@miamidade.gov and a copy to Samuel.Marti@miamidade.gov
Post-Bid
Water / Sewer
$2,025,558.00
Public - County
Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
July 30, 2025
1015 N America Wy, Miami, FL
Related To This Project
Miami, FL
Bid Date: Jul 10 2025
Miami, FL
Bid Date: Jul 02 2025
Miami, FL
Bid Date: Jul 16 2025
Miami, FL
Bid Date: Jul 23 2025
Miami, FL
Bid Date: Jul 09 2025
Miami, FL
Bid Date: Aug 04 2021
Miami, FL
Bid Date: Jun 24 2025
Miami, FL
Bid Date: Jul 02 2025
Miami, FL
Bid Date: Jun 30 2025
Miami, FL
Bid Date: Jul 02 2025
Miami, FL
Bid Date: Jun 10 2025
Miami, FL
Bid Date: May 29 2025
Miami, FL
Bid Date: May 29 2025
Miami, FL
Bid Date: Jun 20 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
