Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 29, 2025 at 8:00 PM
Updated May 30, 2025
Site work, paving and outdoor lighting for a civil project in Farmington, New Mexico. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; and bridge / tunnel.
Project Type : Road - Reconstruction (6) Limits : NM 68 from US84/285 to Thorton Lane from MP 0 to MP 1.4 (1.4 mile) NM 68 Bridge 5717 from MP .04 to MP .04 NM 68 Bridge 5718 from MP .04 to MP .04 US 84 from Upper San Pedro Rd to Lower San Pedro Rd from MP 188 to MP 188.5 (.5 mil Description : Roadway Reconstruction, access control, lighting, intersection improvements, drainage, bridge preservation County : San Juan Construction : 2026 As of May 29 2025, the project is in Conceptual status. Letting Date 09/15/2028 NMDOT - NM 68 Roadway Reconstruction Phase I *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$43,860,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2029
US-64, Farmington, NM
Related To This Project
Farmington, NM
Bid Date: Aug 07 2025
Farmington, NM
Bid Date: Jun 25 2025
Farmington, NM
--
Farmington, NM
Bid Date: Jul 21 2025
Farmington, NM
Bid Date: Aug 13 2025
Farmington, NM
Bid Date: Aug 07 2025
Farmington, NM
Bid Date: Jun 05 2025
Farmington, NM
Bid Date: Jun 05 2025
Farmington, NM
Bid Date: Jun 12 2025
Farmington, NM
Bid Date: May 21 2025
Farmington, NM
Bid Date: May 27 2025
Farmington, NM
Bid Date: May 22 2025
Farmington, NM
Bid Date: May 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
