Published July 10, 2025 at 8:00 PM

Updated November 20, 2025

Renovation of a civil project in Madison, Wisconsin. Completed plans call for the renovation of a water / sewer project.

The work includes the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8" to 24" diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10" to 12". PREQUALIFICATION APPLICATION DUE (2:00 P.M.) 6/12/2025 Submission of qualifications shall be made to the Project Engineer on or before June 12, 2025 at 2:00pm. The Engineer shall then respond to the Contractor accepting or denying qualifications and eligibility to bid on the project by June 16, 2025. No submittals received after June 12 shall be considered. The contact information for the Project Engineer SBE GOAL 3% This contract shall include the trenchless rehabilitation of approximately 10,046 linear feet of sanitary sewer pipelines ranging in size from 8" to 24" diameter AND approximately 120 linear feet for storm sewer pipelines ranging in size from 10" to 12". The trenchless rehabilitation will be accomplished using an Ultraviolet light cure CIPP system except for one location where a thermal cure (i.e. steam cure or circulating heated water cure) CIPP system may be utilized. Rehabilitation of the sewer shall be without excavation by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight fitting throughout the entire length of the original pipe. The CIPP shall extend the full length of the original pipe and provide a structurally sound, jointless and watertight new pipe within a pipe. All service connections to buildings shall be reinstated without excavation, utilizing a remote-controlled cutting device, monitored by a video TV camera. The Contractor is responsible for proper, accurate and complete installation of the CIPP using the system selected by the Contractor and approved by the Engineer. Neither the CIPP system nor its installation shall cause adverse effects to any of the City of Madison's processes or facilities. The use of the product shall not result in the formation or production of any detrimental compounds or by-products at the wastewater treatment plant. The Contractor shall cleanup, restore existing surface conditions and structures, and repair any of the CIPP system determined to be defective. The Contractor shall conduct installation operations and schedule cleanup in a manner to cause the least possible obstruction and inconvenience to traffic, pedestrians, businesses, and property owners or tenants. The specific pipe sections that are included in the scope of this contract are identified in the Detailed Lining List shown on the accompanying plan set. This section is a required document for the bid to be considered complete. These are the choices for meeting the bid bond requirement. One: The bid bond can be submitted in the form of a certified check. Two: Bid bond (City of Madison form). Three: Biennial bid bond on file with the City of Madison. Questions regarding SBE Program requirements may be directed to Tracy Lomax, Affirmative Action Division. Tracy may be reached at (608) 267-8634, or by email, TLomax@cityofmadison.com Bond Percentage 5%

Award

Water / Sewer

$927,079.00

Public - City

Renovation

19

5

4

7

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
145
Bidding Soon
1,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

September 16, 2025

Project location map

To Be Determined, Madison, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.