EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2025 at 8:00 PM

Updated June 27, 2025

Site work for a water / sewer project in Commerce City, Colorado. Completed plans call for site work for a water / sewer project.

Lake Bluff Subdivision Tract I Improvements A Description of the Work to Be Performed is: Earthwork, Underground Utilities, Storm Drainage, Roadway Improvements and Erosion Control. Question Deadline 06/20/2025 at 5:00 PM MT Any Questions Concerning This Bid Shall Be Directed in Writing to: Jeff Blankenship at Jeff@silverbluffcompanies.com. A Bid Bond in An Amount Equal to Ten Percent (10%) of the Total Bid Amount Will Be Required. The Bid Bond Will Be Retained by Owner as Liquidated Damages Should the Successful Bidder Fail to Enter Into a Contract With the Owner in Accordance With the Bid. Bidders Must Supply a List of Subcontractors Providing $10,000 Or More in Labor and/or Materials to the Project. Attention is Called to the Fact That Bidders Offer to Assume the Obligations And Liabilities Imposed by the Contract Documents. The Successful Bidder For the Project Will Be Required to Furnish a Performance Bond and a Labor And Materials Payment Bond in the Full Amount of the Contract Price, in Conformity With the Requirements of the Contract Documents. Bidders Are Hereby Advised That the Owner Reserves the Right to Not Award a Contract Until Sixty (60) Days From the Date of the Opening of Bids, and Bidders Expressly Agree to Keep Their Bids Open for the Sixty (60) Day Time Period. Owner Reserves the Right to Reject Any and All Bids, to Waive Any Informality, Technicality or Irregularity in Any Bid, to Disregard All Non-conforming, Nonresponsive, Conditional or Alternate Bids, to Negotiate Contract Terms With the Successful Bidder, to Require Statements or Evidence of Bidders' Qualifications, Including Financial Statements, and to Accept the Proposal That is in the Opinion Of the Owner in Its Best Interest. Owner Also Reserves the Right to Extend the Bidding Period by Addendum if It Appears in Its Interest to Do So.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

44

8

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
49
Bidding Soon
836
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 25, 2025

img_map_placeholder

18335 E 103rd Ave, Commerce City, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.