BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Renovation of a data center facility in San Antonio, Texas. Completed plans call for the renovation of a data center facility.

Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio. Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements. Accessing Protected Proposal Documents: The Access Request Link is located below Attachments/Links header. If you cannot request RFP HC102825R0040 protected document access: -Are you logged into SAM Communications with the Contractor will be conducted with the identified Point(s) of Contact (POC). Should a change in POC be required, the Contractor shall initiate this request through notification to the Contracting Officer. Contracting Officer Name: John Ross Organization/Office Symbol: PS8332 Phone No.: 667-890-8085 E-Mail Address: John.M.Ross138.civmail.mil Contract Specialist Name: Eric Mead Organization/Office Symbol: PS8332 Phone No.: 667-890-5358 E-Mail Address: ERIC.L.MEAD2.civmail.mil COR/Mission Partner Point of Contact (Note: To be filled in upon contract award) Name: Organization/Office Symbol: Phone No.: E-Mail Address: -Are you a registered SAM Point of Contact within your organization -Is your organization represented by NAICS 337214 -Is your organization an SBA certified Small Business RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support. Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations. POP 15-JUL-2025 TO 14-JAN-2026 The contracting officer (KO) and contract specialist (CS) are the sole points of contact for this procurement. Address any or concerns you may have to the KO/CS. Written requests for clarification must be sent to the CS/KO at eric.l.mead2.civmail.mil and john.m.ross138.civmail.mil.

Post-Bid

Data Centers

$500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
6
Bidding Soon
1,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

September 20, 2025

Project location map

To Be Determined, San Antonio, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.