Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated September 16, 2025
Site work for a water / sewer project in Jefferson, South Carolina. Completed plans call for site work for a water / sewer project.
******THE PLANS AND SPECIFICATIONS ON FILE ARE FOR "REVIEW ONLY". IN ORDER TO SUBMIT AN ELIGIBLE BID, CONTRACTORS ARE REQUIRED TO GET A COPY OF THE PLANS AND SPECIFICATIONS FROM HANNA ENGINEERING.****** All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project consists of the installation of approximately 1,000 linear feet of 8" water line, 10,200 linear feet of 6" water line, 19 new fire hydrants and all associated appurtenances. Bids will be received for a single prime Contract. The project is being funded (in part) by a loan from the State Revolving Fund and therefore bidders must comply with all applicable State and Federal requirements identified in the contract documents. Products used for construction must meet American Iron and Steel standards. Another requirement of the project is that prospective bidders must implement procedures that ensure disadvantaged business enterprise (DBE) firms are given opportunities for meaningful participation if subcontracts are awarded. The contractor must follow the "good faith" strategies outlines in the "Disadvantaged Business Enterprise" (DBE) compliance section of the Federal Requirements for SRF Funding. The goal stated in the contract documents for participation by MBE/WBE firms is MBE: 3.6% and WBE: 2.4%. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidder must make positive efforts to use small and minority owned businesses. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law to perform the type of work specified. No bidder may withdraw the bid within 90 days after the actual date of the opening and thereof All communication about the receipt of plans, bid results and contract award should be directed to the Engineer's Office. Contractors shall have a proper classification of WL. The Owner reserves the right to waive any informalities or to reject any or all bids.
Award
Water / Sewer
$1,321,224.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2025
October 1, 2025
Multiple Locations, Jefferson, SC
Related To This Project
Jefferson, SC
Bid Date: Mar 04 2022
Jefferson, SC
Bid Date: Aug 23 2022
Jefferson, SC
Bid Date: Aug 25 2022
Charleston, SC
Bid Date: Jun 26 2025
Sumter, SC
Bid Date: Jul 03 2025
Lexington, SC
Bid Date: Jul 01 2025
Charleston, SC
Bid Date: Jun 10 2025
Spartanburg, SC
--
Newberry, SC
Bid Date: Jun 26 2025
Hilton Head Island, SC
Bid Date: Jun 03 2025
Gresham, SC
Bid Date: Jun 20 2025
Saluda, SC
Bid Date: Jun 20 2025
Sumter, SC
Bid Date: Jun 30 2025
Sumter, SC
Bid Date: Jun 25 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
