BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work for a water / sewer project in Jefferson, South Carolina. Completed plans call for site work for a water / sewer project.

******THE PLANS AND SPECIFICATIONS ON FILE ARE FOR "REVIEW ONLY". IN ORDER TO SUBMIT AN ELIGIBLE BID, CONTRACTORS ARE REQUIRED TO GET A COPY OF THE PLANS AND SPECIFICATIONS FROM HANNA ENGINEERING.****** All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project consists of the installation of approximately 1,000 linear feet of 8" water line, 10,200 linear feet of 6" water line, 19 new fire hydrants and all associated appurtenances. Bids will be received for a single prime Contract. The project is being funded (in part) by a loan from the State Revolving Fund and therefore bidders must comply with all applicable State and Federal requirements identified in the contract documents. Products used for construction must meet American Iron and Steel standards. Another requirement of the project is that prospective bidders must implement procedures that ensure disadvantaged business enterprise (DBE) firms are given opportunities for meaningful participation if subcontracts are awarded. The contractor must follow the "good faith" strategies outlines in the "Disadvantaged Business Enterprise" (DBE) compliance section of the Federal Requirements for SRF Funding. The goal stated in the contract documents for participation by MBE/WBE firms is MBE: 3.6% and WBE: 2.4%. Bid security shall be furnished in accordance with the Instructions to Bidders. Bidder must make positive efforts to use small and minority owned businesses. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law to perform the type of work specified. No bidder may withdraw the bid within 90 days after the actual date of the opening and thereof All communication about the receipt of plans, bid results and contract award should be directed to the Engineer's Office. Contractors shall have a proper classification of WL. The Owner reserves the right to waive any informalities or to reject any or all bids.

Award

Water / Sewer

$1,321,224.00

Public - City

Site Work

21

14

2

9

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
77
Bidding Soon
1,548
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

October 1, 2025

Project location map

Multiple Locations, Jefferson, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.