BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Renovation of an educational facility in Sumter, South Carolina. Completed plans call for the renovation of a educational facility.

Renovate M500 Mechanical room to replace air handler, boilers, water heater, piping, controls, electrical, etc. as shown in documents. Construction Cost Range: $950,000 to $1,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Install Air Handler, boilers, water heater, pumps. Install piping for a complete and functioning system included associated controls and electrical work. 2. Provide all labor, materials, equipment and supervision to construct complete and operable mechanical systems as indicated on the drawings and specified herein. All materials and equipment used shall be new, undamaged and free from any defects. 3. Contractor shall coordinate system shutdown with CCTC Staff. To reduce system shutdown to a minimum a coordinated schedule shall be provided prior to any work. The contractor is encouraged to pre manufacture as many components as possible to reduce total down time of the system prior to shutting down the system. Staging of materials on site is permitted with guidance and approval of CCTC staff. 4. The contractor is responsible to contact the CCTC Fire and Life Safety Department to request a hot work permit to allow welding, grinding, brazing and other smoke or dust producing activities to prevent accidental activation of campus fire alarm systems. 5. All materials and equipment demolished shall be removed from site and disposed of properly. 6. The contractor shall provide a record that all hazardous materials have been removed, such as refrigerants, by a qualified recovery subcontractor and provide a copy to the CCTC Project Manager. 7. Startup of equipment shall be provided by a factory start up agent. Startup documents shall be provided to the CCTC Project Manager. 8. Building Automation control removal and installation of new controls shall be provided under the contractor's sub-contractor team by Control Management Inc. (CMI) Controls. All questions & correspondence concerning this Invitation shall be addressed to the A/E. A/E NAME: DWG, Inc. A/E CONTACT: Colton Mason EMAIL: CMASON@DWGINC.COM TELEPHONE: (843) 849-1141

Award

Educational

$845,075.00

Public - State/Provincial

Renovation

16

11

37

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
3
Bidding Soon
700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

August 28, 2025

Project location map

506 N Guignard Dr, Sumter, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.