BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and new construction of a fire / police facility in Sumter, South Carolina. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of 7/17/2025, this project has not yet been awarded. A timeline for award was not determined. Two New Facilities for the Sheriffs Office (Classroom Building & Shooting Range Tower) located at 2185 East Brewington Road, Sumter, South Carolina. The scope of work consists of: Classroom Building: Brick and veneer and wood frame building composed of a classroom with adjacent storage, and toilet rooms. Range Tower: Two-story brick veneer and wood frame building composed of storage areas for range equipment and an upstairs observation room with an open balcony.

Post-Bid

Fire / Police

$200,000.00

Public - County

New Construction, Site Work

28

18

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
4
Bidding Soon
638
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

June 19, 2025

Project location map

2185 E Brewington Rd, Sumter, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.