BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Site work for a water / sewer project in Red Wing, Minnesota. Completed plans call for site work for a water / sewer project.

The project includes the following work on the 1,200,000-gallon, partially buried, concrete ground storage reservoir that is estimated to have been constructed in the 1940's. Repairs have been made to the reservoir over the years, with the most notable being a new shotcrete style cap over the entire roof. 1. Cleaning and repairing the interior and exterior concrete roof, walls, and floor. 2. Structure modifications and surface repairs. Reservoir out-of-service schedule to start on September 3, 2025 and end by October 31, 2025. SCOPE Regulatory Requirements This specification covers the requirements for worker protection, environmental protection, and the handling of debris generated from industrial paint removal. It is consistent with the intent of these contract documents to describe those performance standards, often broad and general in nature, required to provide a complete and operating system. It shall be the responsibility of the Contractor to familiarize themselves fully regarding the detailed needs and requirements of any and all regulatory agencies having jurisdiction over this work. These detailed needs and requirements shall be accommodated, as part of the Work, in every manner just as if they were prescribed in these Contract Documents. The Contractor shall comply with and have documented Confined Entry Space Procedures available at the reservoir site at all times, as required by OSHA 29 CFR 1910.146. The Contractor shall also comply with any state and/or local requirements which are more restrictive than the federal requirements. The Contractor shall comply with safe working practices for cleaning, burning, welding, and handling non-lead-based coated steel, and all health and safety regulations and requirements of federal, state, and local health regulatory agencies, and any Safety Data Sheets (SDS). This compliance shall be accomplished without supervision from the Engineer, or other direct or indirect agents of the Engineer. All rigging attachments present on the reservoir shall be carefully inspected by the Contractor immediately prior to use. The Contractor assumes all responsibility for use of any existing or added attachments. Question Deadline 06/24/2025 questions shall be addressed to KLM Engineering, Inc., 1976 Wooddale Drive, Suite 4, Woodbury, MN 55125, attention Benjamin Feldman, Project Engineer or by email to bfeldman@klmengineering.com.

Award

Water / Sewer

$1,089,300.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
164
Bidding Soon
1,464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

August 1, 2025

Project location map

Multiple Locations, Red Wing, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.