BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work and paving for a sidewalk / parking lot in Malad City, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Complete Work is for the Construction for the Malad Forest Service Grant Pathway, Sprinkler System, Drip Irrigation System, and Tree Planting. The Work Includes but is Not Limited to, the a New Sprinkler and Drip Irrigation System for the Existing City Park And City Park Expansion, Tree Planting, Excavation, Preparation and Installation of Gravel Pathway at the Parks. Bid Security: Each Proposal Must Be Submitted on the Prescribed Form and Accompanied by Bid Security in the Form of a Certified Cashier's Check or a Corporate Bid Bond Executed on the Prescribed Form, Payable to the Malad City, Idaho in the Amount of Five Percent (5%) of the Amount Bid. The Successful Bidder Will Be Required to Furnish Performance and Payment Bonds, Each in the Amount Not Less Than 100% of the Contract Price. Submittal of Bid: The Electronic Bid Shall Be Placed in the Restricted Access File, the Path Will Be Provided to Bidders on Planholder's List at a Later Date. The File Shall Be Plainly Labeled With the Name of the Bidder and Shall Bear the Words "Bid for," Followed by the Project Title Per the Contract Documents and the Date and Hour of Opening of Bids. The Certified or Cashier's Check, Money Order, or Bidder's Bond Shall Be Enclosed in the Same File With the Bid. Refer to Article 14 in Ejcdc C-200- "Instructions to Bidders" for Additional Submittal Requirements. Labor Requirements: The Attention of Bidders is Directed to the Applicable Federal and State Requirements Regarding Conditions of Employment To Be Observed. All Bidders Are Required to Comply With Executive Order No. 11246 Regarding Equal Employment Opportunities. Project Administration: All Questions Relative to This Project Prior to the Opening of Bids Shall Be Directed to the Engineer for the Project, and All Questions Shall Be in Writing. It Shall Be Understood, However, That No Interpretations of the Manufacturer's Drawings Will Be Made by Telephone. For "or Equal" Items to Be Considered for Evaluation, Contractor Must Submit Information in Compliance With Article 10 in Ejcdc C-200 - "Instructions to Bidders." Questions Will Be Answered Three (3) Days Prior to Bid Date.

Award

Sidewalks / Parking Lot

$743,927.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
290
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

Multiple Locations, Malad City, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.