BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Renovation of a municipal facility in Poplar Bluff, Missouri. Conceptual plans call for the renovation of a municipal facility.

Butler County requests qualifications for preliminary architectural services, cost estimate, and subsequent design and inspection services to assist in a proposed renovation project for the Ozark Foothills Recycling Center to be partially financed with FY25 Community Development Block Grant (CDBG) Community Facility funds. The proposed project consists of ADA compliance upgrades for the restrooms, new lighting, and new roofing, Project estimate will be equal to or less than the cap allowable amount of $500,000. Information provided to the Butler County must include: 1. The specialized experience and technical competence of the firm with respect to street and transportation improvements or related work. 2. The capacity and capability of the firm to perform the work in question, including specialized services, within a period of twelve months beginning June 10th, 2025. 3. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules. 4. The firm's proximity to and familiarity with the area in which the project is located. 5. References from previous clients of related work with the firm within the past five years. 6. Documentation of E-Verify requirement compliance. The firm will be selected based on the above qualifications. Once the most qualified firm is selected, a cost for preliminary architectural services will be negotiated separately from the cost for architectural design. Contracting for these activities shall occur separately and costs/payments associated with each will be clearly defined. Contracts executed for architectural design and construction inspection services shall be contingent upon the award of the grant and commitment of all project funds. Butler County and the Ozark Foothills Recycling Center are Equal Opportunity Employers, and invite the submission of proposals from minority, women, and Section 3-owned firms. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$500,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
28
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2026

Project location map

1625 Rowe Pkwy, Poplar Bluff, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.