BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Demolition, site work, paving and new construction of a mixed-use development in Tiskilwa, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A certified check or bank draft, payable to the order of the Village of Tiskilwa, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The Village of Tiskilwa reserves the right to reject any or all Bids or to waive any informalities in the bidding. Bids may be held by the Village of Tiskilwa for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. Bids are invited upon the several items and quantities of work as follows: Removal of four small bridges and replacement with a 30' long 16' x 4.5' precast box culvert and bituminous approach pavement on State Street; a 30' long 16' x 6' precast box culvert and bituminous approach pavement on Main Street: a 38' long 10' x 6' precast box culvert and bituminous approach pavement on 1 Street (referred to on the plans as High Street) and; a 49' long x 32' wide bridge with 48' wide precast concrete deck beams supported on cast in place pile caps on 12" steel shell piles. This bridge has a sidewalk on one side and concrete approach slabs and bituminous approaches

Bid Results

Bridges / Tunnels

$999,030.00

Public - City

Demolition, New Construction, Paving, Site Work

56

6

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
154
Bidding Soon
1,863
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

July 25, 2025

Project location map

Multiple Locations, Tiskilwa, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.