Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
This is a service / maintenance or supply contract in Kennesaw, Georgia. Contact the soliciting agency for additional information.
The Cobb County Department of Transportation (CCDOT) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) to provide Engineering Design Consultant Services for the above referenced project. The project consists of funding by Federal and local sources. Accordingly, the successful firm will be required to comply with all applicable Federal, State, and County rules and regulations. The funding sources REQUIRE this project to conform to the Georgia Department of Transportation's (GDOT) Plan Development Review Process. All engineering services shall be in accordance with all applicable guidelines of the American Association of State Highway and Transportation Officials, GDOT Standard Specifications for the Construction of Transportation Systems, Project Schedules, Plan Development Review Process, and Plan Presentation Guidelines, CCDOT Pre-Construction Process and Procedures Manual, and all other applicable CCDOT guidelines. All project deliverables must be submitted to CCDOT for review and approval. CCDOT will coordinate all submittals to the GDOT. The Noonday Creek Trail Extension project is one of eight high-priority trails identified in the Cobb County Greenways and Trails Master Plan. Additionally, this trail is identified as a regionally significant trail, Project ID "S" in the Atlanta Regional Commission's Walk, Bike, Thrive! Plan regional trail vision. The Noonday Creek Trail Extension is a four-mile extension of an existing multi-use trail along Noonday Creek. The chosen team will perform a concept validation of the recently completed Scoping Study and verify the preferred alternative. The creek-side alternative will follow the general alignment of Noonday Creek, beginning at the existing Bells Ferry Trailhead, passing beneath the Bells Fery Road bridge, briefly crossing to the east side of the creek in the Addison Heights area, crossing back to the western side of the creek south of New Chastain Road, through Noonday Creek Park, and ending at Shallowford Road. When completed the connection underneath the existing Shallowford Road bridge would eliminate the need for the at-grade crossing. The trail is proposed to cross beneath intersecting roadways, using existing bridges. The project will construct a 10-foot-wide multi-use trail with 2-foot unpaved shoulders. A boardwalk will be placed in areas to facilitate movement over wetlands, areas where reoccurring ponding water is likely, and over constructed wetland or stormwater improvements. Small 'walk-up trailheads' are proposed at the northern and southern ends of the proposed trail to provide amenities, such as seating, shade, educational signage, and bicycle 'fix-it' stations. The Roadside alternative provides a multi-use path connecting from the existing Bells Ferry Trailhead beneath Bells Ferry Road bridge to the east side of Bells Ferry Road. From there, it would continue northward along Bells Ferry Road, through the future proposed roundabout at the intersection of Big Shanty Road and continue down to cross New Chastain Road using the existing traffic signal to the existing sewer easement north of New Chastain Road, where it then heads east to meet the western side of Noonday Creek. From there, the trail would follow the Creekside alignment along the west side of the creek into Noonday Creek Park, where it would connect to the proposed future trailhead and PI 0016015. A larger trailhead is proposed within Noonday Creek Park, at the northern end of the park, near the entrance from Shallowford Road. This may include features such as benches, trash receptacles, pet waste stations, a bike rack and repair station, informational and wayfinding signage. This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services as listed in Exhibit I. Firms that respond to this RFQ, and are determined by the County to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The County reserves the right to reject any or all Statements of Qualifications or Technical Approach, and to waive technicalities and informalities at the discretion of the County. CCDOT has adopted a 15% Disadvantaged Business Enterprise (DBE) participation goal assigned to this scope of services. This goal is not to be considered as a fixed quota, set aside or preference. F. Contract Terms and Type CCDOT anticipates one (1) Multi-Phase, Project Specific contract to be awarded to one (1) firm. CCDOT anticipates that the Contract Type may be Lump Sum, Cost Plus Fixed Fee, Cost per Unit of Work or Specific Rate of Compensation. As a Project Specific contract, it is CCDOT's intention that the Agreement will remain in effect until construction completion. G. Contract Amount The contract amount will be determined via negotiations with CCDOT. If CCDOT is unable to reach a satisfactory agreement and at reasonable rates to be paid for the services to be provided, the County reserves the right to terminate negotiations with the highest-scoring finalist and begin negotiations with the next highest scoring finalist. Any questions must be received no later than Friday, June 20, 2025 by 12:00 p.m. Any questions must be received via electronically. The method of Contractor Selection has not been Determined at this time.
Conceptual
Sidewalks / Parking Lot
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 26, 2025
Noonday Creek Trail, Kennesaw, GA
Related To This Project
Kennesaw, GA
Bid Date: Jun 18 2025
Kennesaw, GA
Bid Date: Jul 09 2025
Kennesaw, GA
Bid Date: Jul 09 2025
Kennesaw, GA
Bid Date: Aug 12 2025
Kennesaw, GA
--
Kennesaw, GA
--
Kennesaw, GA
--
Kennesaw, GA
Bid Date: Jul 14 2025
Kennesaw, GA
Bid Date: May 27 2025
Kennesaw, GA
Bid Date: May 13 2025
Kennesaw, GA
Bid Date: May 15 2025
Kennesaw, GA
Bid Date: May 15 2025
Kennesaw, GA
--
Kennesaw, GA
Bid Date: May 06 2025
Kennesaw, GA
Bid Date: May 21 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
