EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Portsmouth, New Hampshire. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; for the addition of a warehouse / distribution facility; for the demolition of a warehouse / distribution facility; and warehouse / distribution facility.

The City of Portsmouth is seeking bidders to respond to BID #33-25 Multi-purpose Recreation Field, Phase 2. Project work includes Construction of the second multi-purpose field on this site. The site is largely preprepared for construction of this field. Work includes installation of the artificial turf field and installation of additional lighting, fences and other ancillary tasks. In addition to the field work, there is also a planned expansion of the parking area and an add/alt for a storage building to support the field activities. Question Submission Deadline: June 16, 2025, 2:00pm Question Response Deadline: June 18, 2025, 2:00pm Bid results will be published within two business days of the bid submission deadline. Bidder agrees that if its bid is accepted it will enter into an Agreement with the Owner in the form included in the solicitation and to perform the work described in the Contract Documents for the prices and within the timelines indicated in this solicitation. Question Deadline 06/16/2025 at 2:00 PM ET All questions shall be submitted through electronically. No statements made by the Owner or the Owner's consultants or representatives made during any pre-bid meeting or other contact shall be deemed to amend this Solicitation or the Contract Documents unless the statement has been incorporated into an Addendum and issued through electronically. Award If an award is to be made, it will be made to the lowest, responsible and qualified bidder. Determination of the lowest bidder will be based on the Base bid, or the Base Bid with any combination of Add Alternates the Owner deems to be in its best interest, for the work described on the bid proposal form. A responsible and qualified bidder is a bidder that: has the ability, capacity and/or skill to perform timely and with quality workmanship; has the supplies and materials of a quality and quantity to meet the specifications; and can meet any other applicable factors as the City reasonably determines necessary or appropriate to the scope of the solicitation and is not otherwise disqualified as described in this solicitation. Verbal notification of award is not considered official. Any action by the bidder to assume otherwise is done so bidder's own risk and the Owner will not be held liable for any expense incurred by a bidder that has not received an official award in writing through online. The City of Portsmouth reserves the right to reject any or all bids, to waive technical or legal deficiencies of any bid, and to accept any bid that may be in the best interest of the City.

Award

Playgrounds / Parks / Athletic Fields

$2,558,531.00

Public - City

Addition, Demolition, Outdoor Lighting, Paving, Site Work

36

21

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Temporary Utilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Subsurface Investigation, Material Testing, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Flooring, Terrazzo Flooring, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Athletic Field Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Purpose Rooms, Athletic and Recreational Special Construction, Safety Netting, Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Special Purpose Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Watering, Bases, Ballasts, and Paving, Base Courses, Subbase Courses, Aggregate Subbase Courses, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
119
Bidding Soon
2,120
All Active Projects
881
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 23, 2025

July 23, 2025

img_map_placeholder

Campus Rd, Portsmouth, NH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.