BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2025 at 8:00 PM

Updated September 25, 2025

Site work for a water / sewer project in Frisco, Texas. Completed plans call for site work for a water / sewer project.

the Frisco Campus Central Utilities Plant Expansion. Question Submission Deadline June 18, 2025, 12:00pm Collin College is seeking qualified proposals for upgrades to the Frisco Campus Central Utilities Plant. Pending approval by the Board of Trustees, work must be completed during the course of Fiscal Year 2026. Extreme coordination between the College and the selected contractor will be required to ensure there is no disruption to campus heating or cooling needs. Temporary chillers and/or boilers may be necessary. A requirement of this project is that the campus remains operational at all times, thus the need for heating and cooling must be maintained for the entire duration of this project. After hours, holiday, and weekend work may be required with no additional cost to the College. A project schedule must be submitted with each proposal. The contractor must identify and inform the College of all long lead items (10 weeks+). Timothy Phillips Contract Administrator 3452 TX-399 Spur McKinney, TX 75069 Email: tphillips@collin.edu Phone: (972) 758-3882 Apply for and provide all necessary documents required for successful permitting through the City of Frisco, Texas. Remove and replace one chiller Modifications of housekeeping pads Remove and replace condenser and chilled water pumps for new chiller Remove and replace VFD's for pumps and Cooling towers Modify catwalk around cooling towers Provide temporary water connections for a water-cooled chiller. Provide temporary connections on the main distribution line to provide cooling during construction Provide temporary chiller(s) during construction - estimated 500 ton with 2 pumps Remove and replace hydronic piping Provide structural support for hydronic piping Remove and replace cooling tower Raise existing cooling towers and provide structural support to produce a consistent water level Provide and install 4 fan coil units for conditioning the Central Utilities Plant Provide new exhaust fan, duct work, and VFD - integrate with refrigerant control panel - includes ensuring existing exhaust fans are tied in with the refrigerant system. Remove existing water softener and install water conditioning system Re-route existing sleeved natural gas piping as specified Replace existing chiller feeders as specified. Relocate cooling towers #3 disconnects. Provide disconnects for temporary chiller(s) Structural pier to be provided, as well as structural support as specified Perform all other work as specified in drawings and specifications A project schedule must be submitted with each proposal

Award

Water / Sewer

$400,000.00

Public - County

Site Work

27

22

29

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
243
Bidding Soon
4,021
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.