BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work and paving for a bridge / tunnel in St Clair Township, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of the T-994 (River Hill Road) Bridge Over Tubmill Creek in St. Clair Township Proposal must be accompanied by cash, certified check, cashier's check, bank good faith check, other irrevocable letter of credit or bid bond in the amount of 10% of the total amount of bid and made payable to the order of the St. Clair Township. Only the Bid Securities listed will be accepted. The St. Clair Township Supervisors reserve the right to reject any or all bid proposals. Question Deadline 07/09/2025 Any questions regarding the specifications should be faxed at least 10 days prior to bid opening to St. Clair Township at 814-446-5184. Questions may be emailed to stclair522@comcast.net Every request for such interpretation should be in writing addressed to St Clair Township, Addressed to: Dennis Rudnik, Township Supervisor 550 Seward Street Seward, PA 15954 Or Faxed to: (814) 446-5184 Emailed: stclair522@comcast.net The description of work to be completed under this Contract is as follows: The work for the construction of the T-994 (River Hill Road) Bridge over Tubmill Creek Replacement in St. Clair Township, Westmoreland County, Pennsylvania, shall include, but is not necessarily limited to 1. Installation and removal of a temporary bypass roadway and temporary bridge structure. 2. Removal of existing multi-beam superstructure. 3. Removal of portions of existing concrete substructure. 4. Construction of new abutment caps on the portion of existing abutments to remain. 5. Furnish & installation of precast block wingwall. 6. Furnish & installation of galvanized steel prefabricated bridge superstructure. 7. Roadway approach work. 8. Guide rail installation. 9. Maintenance and protection of traffic. 10.Erosion and sediment pollution control. B. Project will be completed 120 calendar days after the date of the Notice to Proceed

Award

Bridges / Tunnels

$377,252.00

Public - City

Paving, Site Work

8

10

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
132
Bidding Soon
1,212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

August 22, 2025

Project location map

River Hill Rd, St Clair Township, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.