BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated December 12, 2025

Renovation of a detention facility in Newark, New Jersey. Completed plans call for the renovation of a detention facility.

The Bid Documents for this project are only available for download via Bid Express. Hard copies of the Bid Documents are not available for purchase but may be examined by appointment only at the DPMC Plan Room by contacting Anthony Mangine at Anthony.Mangine@treas.nj.gov. The DPMC Plan Room is located at 33 West State Street, 9 th Floor, Trenton, NJ 08608. Failure to list all of the required DPMC Classified sub-contractors will render the bid non-responsive. DPMC NO: C1090-00 L+G NO: 24020 No bidder may withdraw his bid for 60 calendar days after the opening. The State may reject any and all bids in accordance with applicable law. THE MINORITY PERCENTAGE GOAL REQUIREMENT FOR THIS CONTRACT IS 53% PER SKILLED CRAFT. THE FEMALE PERCENTAGE GOAL REQUIREMENT FOR THIS CONTRACT IS 6.9% PER SKILLED CRAFT. . The project consists of the "one-for-one" replacement of the existing surface mounted fluorescent ceiling light fixtures in the ACSU cells with new LED type surface mounted correctional-grade fixtures and other Work indicated in the Contract Documents. There is a total of 324 ACSU cells where the light fixture is to be replaced. B. Type of Contract: 1. Project will be constructed under a single prime contract. Construct the Work in phases, with each phase substantially complete as indicated on Drawings. 1. Phase 1: Complete all Work associated with the installation of the replacement light fixture for all cells within Building A. a. Commencement of Construction: 1) On-site destructive work (including but not limited to demolition, removal/replacement of existing light fixture) for Phase 1 shall begin once all materials have been received and are on site for Phase 1. Phase 1 including punch list shall be completed before Phase 2 work begins. b. Substantial Completion: 1) Within 21 days after commencement of construction of this phase. 2. Phase 2: Complete all Work associated with the installation of the replacement light fixture for all cells within Building B. a. Commencement of Construction: 1) On-stie destructive work (including but not limited to demolition, removal/replacement of existing light fixture) for Phase 2 shall begin once all materials have been received and are on site for Phase 2. Phase 2 including punch list shall be completed before Phase 3 work begins. b. Substantial Completion: Within 21 days after commencement of construction of this phase. 3. Phase 3: Complete all Work associated with the installation of the replacement light fixture for all cells within Building C.

Award

Jails / Prisons

$824,800.00

Public - State/Provincial

Renovation

16

13

2

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,333
Active Projects
676
Bidding Soon
6,932
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.