Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated December 12, 2025
Renovation of a detention facility in Newark, New Jersey. Completed plans call for the renovation of a detention facility.
The Bid Documents for this project are only available for download via Bid Express. Hard copies of the Bid Documents are not available for purchase but may be examined by appointment only at the DPMC Plan Room by contacting Anthony Mangine at Anthony.Mangine@treas.nj.gov. The DPMC Plan Room is located at 33 West State Street, 9 th Floor, Trenton, NJ 08608. Failure to list all of the required DPMC Classified sub-contractors will render the bid non-responsive. DPMC NO: C1090-00 L+G NO: 24020 No bidder may withdraw his bid for 60 calendar days after the opening. The State may reject any and all bids in accordance with applicable law. THE MINORITY PERCENTAGE GOAL REQUIREMENT FOR THIS CONTRACT IS 53% PER SKILLED CRAFT. THE FEMALE PERCENTAGE GOAL REQUIREMENT FOR THIS CONTRACT IS 6.9% PER SKILLED CRAFT. . The project consists of the "one-for-one" replacement of the existing surface mounted fluorescent ceiling light fixtures in the ACSU cells with new LED type surface mounted correctional-grade fixtures and other Work indicated in the Contract Documents. There is a total of 324 ACSU cells where the light fixture is to be replaced. B. Type of Contract: 1. Project will be constructed under a single prime contract. Construct the Work in phases, with each phase substantially complete as indicated on Drawings. 1. Phase 1: Complete all Work associated with the installation of the replacement light fixture for all cells within Building A. a. Commencement of Construction: 1) On-site destructive work (including but not limited to demolition, removal/replacement of existing light fixture) for Phase 1 shall begin once all materials have been received and are on site for Phase 1. Phase 1 including punch list shall be completed before Phase 2 work begins. b. Substantial Completion: 1) Within 21 days after commencement of construction of this phase. 2. Phase 2: Complete all Work associated with the installation of the replacement light fixture for all cells within Building B. a. Commencement of Construction: 1) On-stie destructive work (including but not limited to demolition, removal/replacement of existing light fixture) for Phase 2 shall begin once all materials have been received and are on site for Phase 2. Phase 2 including punch list shall be completed before Phase 3 work begins. b. Substantial Completion: Within 21 days after commencement of construction of this phase. 3. Phase 3: Complete all Work associated with the installation of the replacement light fixture for all cells within Building C.
Award
Jails / Prisons
$824,800.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 5, 2025
168 Frontage Rd, Newark, NJ
Related To This Project
Newark, NJ
Bid Date: Jun 24 2025
Newark, NJ
Bid Date: Jul 01 2025
Newark, NJ
Bid Date: Jul 10 2025
Newark, NJ
Bid Date: Jun 26 2025
Newark, NJ
Bid Date: Jun 24 2025
Newark, NJ
Bid Date: Aug 19 2025
Newark, NJ
--
Newark, NJ
Bid Date: Jul 24 2025
Newark, NJ
Bid Date: Jun 17 2025
Newark, NJ
--
Newark, NJ
Bid Date: Jul 08 2025
Newark, NJ
--
Newark, NJ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.