BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Renovation of a water / sewer project in Edmonds, Washington. Design plans call for the renovation of a water / sewer project.

As of February 11, 2026, a design firm has been selected for this project. Construction is expected to begin in early 2028. *Previous solicitation listed below for reference:* The CITY OF LYNNWOOD Public Works Department (City) solicits qualifications from engineering consultants to provide engineering services for Lynnwood WWTP Major Upgrades Project. The City anticipates selecting a consultant based on a combination of compiled scores from the Statement of Proposal submissions and interview results. The City may elect to shortlist up to three firms for in-person interviews, and the final selection will be based on the combined evaluation of proposal scores and interview performance. To be considered for this project, firms must meet the qualifications and satisfy the requirements set forth in this RFP. The submission deadline for questions, clarifications, or requests for general information Any requests received after this date will not be addressed. Note that all questions, clarifications, or requests for general information about the project should be submitted electronically via the Q&A section in the project ONLINE. Question Deadline 06/30/2025 at 2:00 PM PT Consultants should avoid contacting the City's Project Manager or other employees to inquire about the project during the advertisement period. All questions will be addressed upon receipt. Responses to general inquiries may be found under the Q&A section of the City's online . Any major changes or clarifications will be issued in an addendum posted on the City's website by June 8, 2025. The CITY OF LYNNWOOD reserves the right to amend terms of this "Request for Proposals" (RFP) to circulate various addenda, or to withdraw the RFP at any time, regardless of how much time and effort consultants have spent on their responses. Project Description The work to be performed by the CONSULTANT consists of conducting a detailed revied of the 2022 WWTP Facility Plan and the City's permit requirements, performing preliminary engineering and environmental studies, and developing design specifications and all pertinent documents to address the project goals and objectives. The CITY OF LYNNWOOD reserves the right to retain the services of the successful firm(s) for any subsequent phases (R/W, CN) associated with this/these service(s). Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: consultant team, relevant qualifications and experience, project approach, client references and SOP attachments. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$330,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
1
Bidding Soon
1,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2028

Project location map

17000 76th Ave W, Edmonds, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.