Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a transportation facility in Reedsville, Pennsylvania. Completed plans call for site work for a transportation facility.

Questions regarding the technical aspects of the bid drawings and/or the contract documents should be directed to the Project Engineer. The Project Engineer is Nicholas Barber and can be contacted by email or phone at nbarber@mjinc.com or 814-594-0240. Bids shall be on the prescribed forms furnished by the Mifflin County Airport Authority and shall be in accordance with the General Provisions, Proposal Requirements and Conditions Section 20. The Mifflin County Airport Authority expressly reserves the right to accept or reject any or all bids or to waive informalities in the same. Each bidder must deposit with this proposal a guarantee in an amount equal to at least ten percent (10%) of his bid. The Bid Guarantee shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified. No bidder may withdraw his bid within one hundred twenty (120) days after the actual date of the opening thereof. Work shall be commenced within ten (10) days of the date specified in the written notification to proceed and shall be fully and finally completed within 30 Calendar days of the date specified in the written notification to proceed DBE Goal for this contract is set at 9.6%. Bidders are encouraged to seek and obtain DBE participation. All DBE firms used to meet this goal must be certified by the PA UCP. Certification as a DBE by the PA UCP is separate and distinct from other certification programs The Contract Bond Form Shall Be Used for All Contracts. There Shall Be No Deviation From This Form. The Contract Bond Shall Consist of Three (3) Parts. Part A Shall Be in a Sum Equal to One Hundred Percent (100%) of the Amount of the Contract Awarded for Faithful Performance. Part B Shall Be in a Sum Equal to One Hundred Percent (100%) of the Amount of the Contract Awarded for Payment of Labor and Material. Part C Shall Be in the Sum Equal to Ten Percent (10%) of the Amount of the Contract Awarded for Maintenance

Bid Results

Transportation Terminals

$58,870.00

Public - County

Site Work

9

17

2

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Special Purpose Lighting, Obstruction Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Airfield Signaling and Control Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
75
Bidding Soon
564
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

img_map_placeholder

547 Airport Road, Reedsville, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.