Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Site work for a water / sewer project in Port Washington, Wisconsin. Design plans call for site work for a water / sewer project.
The vast majority of these project efforts will move forward in conjunction with the availability of grant funding opportunities. While this project is largely reliant on grant funding, we are budgeting for some potential grant match during the next 5 years. A budgeted amount for local share helps considerably with obtaining grants. Having money budgeted will also provide for emergency repairs that could be required by future intense storm events This project is being developed to reduce the bank erosion occurring along Valley Creek, protect sanitary sewers crossing and running alongside the creek, protect existing watermain from being undermined, protect the bike path from failure, reduce the potential for flooding of E. Norport Drive, Hales Trail, and N. Lake Street, and remove invasive species growing along the corridor. This project also has the potential to better connect the stream corridor to Upper Lake Park. Reconstruction of E. Norport Drive and improvements at Birchwood Hills Nature Preserve are also part of this project. This is a complicated project requiring interdisciplinary design. While it is reliant on grant funding, we are budgeting a potential grant match during the next 5 years. A budgeted amount for local share helps considerably with obtaining grants. Having money budgeted will also provide for emergency repairs that could be required by future intense storm events. As of June 10, 2025, this project is included in the City's 2025-2034 Capital Improvement Program (CIP). It is currently in the design phase. Construction is still several years away. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$11,500,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
To Be Determined, Port Washington, WI
Related To This Project
Port Washington, WI
Bid Date: Aug 07 2025
Port Washington, WI
--
Port Washington, WI
Bid Date: Sep 12 2025
Port Washington, WI
Bid Date: Sep 26 2025
Port Washington, WI
Bid Date: Sep 26 2025
Port Washington, WI
Bid Date: Oct 30 2025
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Port Washington, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
