BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Durango, Colorado. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Scope of Work includes improvements to the existing roadway surface from the entrance station to the boat launch area and upgrades to the existing parking lot at the Swim Beach Area with a paved surface, designated as Schedule A, 3R/3R+. Roadway improvements involve full depth reclamation with cement to a depth of 5 inches, followed by a 3-inch asphalt overlay. The parking lot will receive 4 inches of new aggregate base and a 3-inch asphalt overlay. The alignment will generally follow the existing roadway with minor adjustments to improve ditch conveyance. Profile changes will raise the grade in distressed areas to avoid utility conflicts and lower it to reduce fill in the FEMA Zone A floodplain. Full closures of the road and parking lot must be coordinated with Colorado authorities, considering visitor patterns identified by the City of Durango. Principal work items include 1,700 cubic yards of roadway excavation, 4,200 tons of roadway aggregate (Method 2), 12,000 square yards of full depth reclamation with cement, 3,200 tons of asphalt concrete pavement (Type 1), one hydrodynamic separator, 3,300 linear feet of guardrail system MSG Type 2 Class A steel posts, and lump sum temporary traffic control. The estimated bid ranges for Schedule A is between $2,000,000 and $5,000,000. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON OCTOBER 22, 2025 Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions. Consider the following FHWA small business goals in development of Subcontracting plans and efforts: FHWA Small Business Subcontracting Goals (As of FY 2024) Business Size Goal (%) SB 44.0% SDB 5.0% HUBZone 3.0% WOSB 5.0% SDVOSB 5.0% HFLCEO250321PR Questions can be submitted to CFLContracts@dot.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$3,305,713.00

Public - Federal

Paving, Site Work

92

17

4

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
87
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

January 5, 2026

Project location map

Multiple Locations, Durango, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.