Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work and paving for a mixed-use development in Durango, Colorado. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Scope of Work includes improvements to the existing roadway surface from the entrance station to the boat launch area and upgrades to the existing parking lot at the Swim Beach Area with a paved surface, designated as Schedule A, 3R/3R+. Roadway improvements involve full depth reclamation with cement to a depth of 5 inches, followed by a 3-inch asphalt overlay. The parking lot will receive 4 inches of new aggregate base and a 3-inch asphalt overlay. The alignment will generally follow the existing roadway with minor adjustments to improve ditch conveyance. Profile changes will raise the grade in distressed areas to avoid utility conflicts and lower it to reduce fill in the FEMA Zone A floodplain. Full closures of the road and parking lot must be coordinated with Colorado authorities, considering visitor patterns identified by the City of Durango. Principal work items include 1,700 cubic yards of roadway excavation, 4,200 tons of roadway aggregate (Method 2), 12,000 square yards of full depth reclamation with cement, 3,200 tons of asphalt concrete pavement (Type 1), one hydrodynamic separator, 3,300 linear feet of guardrail system MSG Type 2 Class A steel posts, and lump sum temporary traffic control. The estimated bid ranges for Schedule A is between $2,000,000 and $5,000,000. TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE ACCEPTED AFTER 4 P.M. ON OCTOBER 22, 2025 Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions. Consider the following FHWA small business goals in development of Subcontracting plans and efforts: FHWA Small Business Subcontracting Goals (As of FY 2024) Business Size Goal (%) SB 44.0% SDB 5.0% HUBZone 3.0% WOSB 5.0% SDVOSB 5.0% HFLCEO250321PR Questions can be submitted to CFLContracts@dot.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$3,305,713.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2025
January 5, 2026
Multiple Locations, Durango, CO
Related To This Project
Durango, CO
Bid Date: Jun 06 2025
Durango, CO
Bid Date: Sep 08 2025
Durango, CO
Bid Date: Aug 14 2025
Durango, CO
Bid Date: Dec 09 2025
Durango, CO
Bid Date: Jun 20 2025
Durango, CO
Bid Date: Jun 30 2025
Durango, CO
Bid Date: Jun 30 2025
Durango, CO
Bid Date: Jun 17 2025
Durango, CO
Bid Date: Jul 14 2025
Durango, CO
Bid Date: May 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
