Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Demolition, site work, paving and new construction of a mixed-use development in Payson, Arizona. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
PROJECT NUMBER: AZ FS 289(1) PROJECT NAME: AZ NFSR 289 BRIDGE REPLACEMENT PROJECT DESCRIPTION: The project is located in the Tonto National Forest approximately 18 miles East of Payson, AZ. The existing Tonto Creek Bridge (no. 031204000003356) was built in 1956 and is a single lane, concrete slab bridge. NFSR 289 is a two-lane roadway that accesses several residential homes, a fish hatchery, and a summer camp along with many recreational sites and trailheads. The purpose of this project is to replace the existing Tonto Creek Bridge, expand the Horton Springs Parking Lot and improve pedestrian and vehicular safety and access to the recreation sites around the Tonto Creek Bridge on NFSR 289. SCOPE OF THE WORK: The scope of the project includes reconstructing a portion of FR 289, removing the existing bridge and constructing a new single-span bridge over Tonto Creek including new sidewalk and reconstruction of the Horton Springs Parking Lot. This project includes removal of the existing two-span bridge, including removal of the existing pier. The project also includes channel grading in Tonto Creek. The new roadway and bridge will be constructed East of the existing alignment (upstream of the existing bridge) to minimize impacts to public traffic. PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 LPSM 20401-0000 Roadway Excavation: 3,100 CUYD 20401-0000 Roadway Excavation (Channel Excavation): 500 CUYD 20441-0000 Waste: 2,300 SQFT 30202-2000 Roadway Aggregate, Method 2: 750 TON 40301-0100 Asphalt Concrete Pavement, Type 1: 535 TON 50101-2600 Minor Concrete Pavement, Plain, 6-Inch Depth, 180 SQYD 55201-0200 Structural Concrete, Class A (AE): 252 CUYD 55302-1100 Precast, Prestressed Concrete Box Beam, Type B2-48: 448 LNFT 55401-1000 Reinforcing Steel: 14,200 LB 55401-2000 Reinforcing Steel, Epoxy-Coated: 18,500 LB 55601-0900 Bridge Railing, Steel: 162 LNFT 62801-000 Temporary Stream Diversion: LPSM ANTICIPATED SCHEDULE: Advertisement - October 2025 Award - December 2025 NTP - January 2026 Contract Completion - October 2026 Due to weather, no onsite work is anticipated between January and April 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000 Question Deadline 11/12/2025: 4:00 PM MT Consolidate all questions on a single word document and submit NLT the deadline to submit technical questions. Questions can be submitted to CFLContracts@dot.gov. Consider the following FHWA small business goals in development of Subcontracting plans and efforts: FHWA Small Business Subcontracting Goals (As of FY 2025) Business Size Goal (%) SB 34.0% SDB 5.0% HUBZone 3.0% WOSB 5.0% SDVOSB 5.0% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$3,667,416.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2025
January 19, 2026
Forest Service Rd 289, Payson, AZ
Related To This Project
Payson, AZ
Bid Date: Jul 02 2025
Payson, AZ
--
Payson, AZ
--
Payson, AZ
Bid Date: Oct 21 2025
Payson, AZ
--
Payson, AZ
--
Payson, AZ
Bid Date: Jun 04 2025
Payson, AZ
Bid Date: May 09 2025
Payson, AZ
Bid Date: Jan 16 2026
Payson, AZ
Bid Date: Feb 13 2025
Payson, AZ
Bid Date: Dec 17 2024
Payson, AZ
--
Payson, AZ
--
Payson, AZ
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
