Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2025 at 8:00 PM
Updated July 10, 2025
Site work for a water / sewer project in Hominy, Oklahoma. Completed plans call for site work for a water / sewer project.
DESCRIPTION OF THE WORK: The Project consists of replacing seven (7) existing fire hydrants assemblies with new fire hydrant assemblies; fully removing two (2) existing fire hydrant assemblies; adding three (3) new fire hydrant assemblies; and connecting all new fire hydrant assemblies into City of Hominy's Water System within the Osage Nation's Hominy Village. The primary work elements ("the Work") includes but is not limited to the following: Provide all materials, equipment, and labor necessary to replace existing fire hydrant assembly, including lateral branch connection, with a new fire hydrant assembly for fire hydrants that were determined qualified for replacement. The completed Work will also require pre-construction field verification with City of Hominy staff for all selected existing fire hydrants and verification of water system isolation valve locations; complete disconnection and removal of selected existing fire hydrant assemblies; cap existing tee at existing fire hydrant assembly disconnection location; construction and installation of new fire hydrants assemblies; connection of new fire hydrant assemblies to existing water main; pressure test and disinfection of new fire hydrant assemblies; full removal and proper disposal of replaced fire hydrant assemblies; and post construction cleaning. Additional details of the Work are provided in the Contract Drawings. Proper construction phasing will be required for this project to minimize interruption of water service to all affected customers located within and outside Hominy Village. Approval of Successful Bidder's construction schedule will be required prior to issuance of Notice to Proceed. CONTRACT TIME: The Work shall be completed no later than one hundred and eighty (180) Days after the commencement date. A certified check, cashier's check or bid bond equal to five percent (5%) of the bid, which shall be deposited with the Procurement Officer as a guaranty; RESERVATION OF RIGHTS: The Nation specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from the bidding requirements not involving time, price, or quality of the Work.
Post-Bid
Water / Sewer
$300,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
