Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated June 5, 2025
Site work for a municipal facility in Idaho Springs, Colorado. Working plans call for site work for a municipal facility.
This project consists of transporting and installing one precast concrete toilet and the associated site work at the Herman Gulch Trailhead site located on the Clear Creek Ranger District of the Arapaho and Roosevelt National Forests. The toilet construction would include, but not limited to, quality control, clearing and grubbing, demolishing the existing abandoned concrete pad and vault, hauling of existing toilet vault and all associated features off-site to a state-approved landfill, new structure excavation, bedding and compaction, backfilling, site grading, transporting and installing a double vault toilet, and supplying and installation of concrete bollards, and resetting in-place of any parking bumpers or any existing features that are displaced as a result of construction. The existing vault hole shall be utilized and modified to accommodate the new toilet, as necessary. The primary objective is to provide quality facilities that are attractive, functional, safe, and economical to operate and maintain, and which comply with applicable codes, standards and principles of sustainability and accessibility standards at the trailhead site. The finished product must be in compliance with the Americans with Disabilities Act (ADA). This is a presolicitation snyopsis for GXT Toilet Replacment in the Arapaho & Roosevelt National Forests & Pawnee National Grassland. If you are interested please contact Erick Plamann at erick.plamann@usda.gov by 6/18/2025. The anticipated magnitude for this project is between $100,000 and $250,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Municipal
$250,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2025
Multiple Locations, Idaho Springs, CO
Related To This Project
Idaho Springs, CO
Bid Date: Jun 09 2025
Idaho Springs, CO
Bid Date: Jul 17 2025
Idaho Springs, CO
Bid Date: Jul 21 2025
Idaho Springs, CO
Bid Date: Aug 26 2025
Idaho Springs, CO
Bid Date: Nov 10 2025
Idaho Springs, CO
Bid Date: Mar 03 2026
Idaho Springs, CO
Bid Date: Mar 26 2026
Idaho Springs, CO
Bid Date: Mar 16 2026
Idaho Springs, CO
--
Idaho Springs, CO
--
Idaho Springs, CO
--
Idaho Springs, CO
--
Idaho Springs, CO
--
Idaho Springs, CO
--
Idaho Springs, CO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
