BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work, paving, new construction and renovation of a mixed-use development in Niobrara, Nebraska. Completed plans call for the construction of a road / highway; for the renovation of a road / highway; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The Ponca Tribe of Nebraska is accepting bids for the construction of improvements to the Agency Grounds Educational Trail located at 88915521st Avenue, Niobrara, NE 68760. The 31st Annual Ponca Tribe of Nebraska Powwow will be held at theAgency Grounds August 7-10, 2025.Grounds must be usable during Powwow and as much construction as possible should be completed by August 1, 2025. This Project will beconstructed under a single primecontract or may be constructed underfour (4) separate contracts under theOwner's supervision. The Work includesof the improvements on the PoncaAgency grounds including pavement ofthe roads (currently gravel), newsidewalks and ADA parking spaces,pavement of RV spaces, water andelectricity to the RV spaces, an newparking lot (part concrete paved, partgravel), a new dump station and a newrestroom/shower house. The Restroom/ Shower House Building is a new onestory, wood-framed building. The Workincludes but is not limited to: woodframing; cast-in-place concretefoundation walls; concrete slab ongrade; metal siding (trim & soffitpanels; metal roof, gutters anddownspouts; hollow metal frames anddoors, plumbing, HVAC and electricalwork. Sitework will include earthworkand grading, concrete paving, siteutilities and erosion control.Owner-provided work on this projectincludes two septic systems and a newwell near the dump station. Thisproject is subject to the requirementsof the Davis-Bacon Act. For questions regarding the project, contact RoySmart, English and Smart Architects,rsmart@englishandsmart.com, 612-597-1143. The Ponca Tribe of Nebraskareserves the right to waive irregularitiesand to reject any bids. Bid Result - Dirtwork, Gravel, Storm Sewer & Paving - Feimer Construction, Inc - $1,597,007.37 Site Utilities - Plumbing - Hackel Construction, Inc - $154,500.00 Site Utilities - Electrical - Hackel Construction, Inc - $157,000.00 Restroom & Shower House Building - Hackel Construction, Inc - $596,339.00

Bid Results

Sidewalks / Parking Lot

$2,504,846.00

Public - Federal

New Construction, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
28
Bidding Soon
298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 1, 2025

Project location map

88915521st Avenue, Niobrara, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.