Published July 10, 2025 at 8:00 PM

Updated July 11, 2025

Site work for a playground / park / athletic field in Fitchburg, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The project is the construction of two new playgrounds using Kompan playground equipment at the new Crocker Elementary School site (200 Bigelow Road, Fitchburg, MA 01420). Playgrounds must be installed in the following timeline inaccordance with availability of the two sites as determined by the owner and the General Contractor (Fontaine Brothers, INC) completing the Crocker Elementary School construction project.: o 3rd-5th playground and PIP rubber: 8/1/25-10/1/25 o 1st-2nd playground and PIP rubber: 10/1/25-4/15/26 A bid deposit of at least five percent (5%) of the total project is required. A Labor and Materials Payment Bond in the sum of 50% of the Contract Price will be required of the successful Bidder. Project is subject to compliance with prevailing wage requirements. This solicitation is being conducted in accordance with the provisions of Massachusetts General Laws Chapter30 &39M, and any resulting contract will be strictly awarded in accordance with the requirements of the solicitation. The City reserves the right to reject any or all bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids. The City reserves the right to waive all informalities not involving price, time, or changes in the scope of work and to negotiate contract terms with the successful bidder. Complete sets of bidding documents shall be used in preparing bids; the City does not assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of bidding documents or for modifications to the bidding documents including electronic conversion. The installation of the Poured in Place rubber surfacing "DuraPlay" must meet the attached specifications from "DuraPlay" and should be subcontracted out. The full proposed cost is expected to include the cost of the subcontractor for "DuraPlay" and any and all other subcontractors. o Includes all related Site work including but not limited to excavation, backfill and grading. Installation of prepurchased Kompan, INC play equipment per manufacturer specifications. o Installation of at least 124 cubic yards of EWF at 15-20" depth. o Installation of at least 5,107 square feet of Poured in Place surfacing. o Installation of at least 5,107 square feet of 6'' crushed stone subbase. o Installation of aromatic, flush edge/roll from PIP into EWF. o Installation and maintenance of erosion controls. Question Deadline 06/17/2025 Online portal.

Award

Playgrounds / Parks / Athletic Fields

$280,000.00

Public - City

Site Work

4

3

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
587
Active Projects
131
Bidding Soon
4,509
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

August 1, 2025

Project location map

200 Bigelow Rd, Fitchburg, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.