Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 6, 2025 at 8:00 PM
Updated October 9, 2025
This is a service / maintenance or supply contract in Raleigh, North Carolina. Contact the soliciting agency for additional information.
Geotechnical, Construction Materials Testing, and Special Inspection services are required for Cates West Development. This project will provide new student housing and dining facilities in multiple phases to address increased demand driven by enrollment growth and the freshman live-on-campus requirement. The project will construct about 3000 traditional and semi-suite style student beds and a new 1500-seat dining facility on Central Campus, and will have a focus on sustainability. 800,000 GSF of housing 100,000 GSF of dining 25,000 GSF of student life space Three existing student housing buildings, a dining facility, and a small service building at the end of their useful lives will be demolished as part of this multi-phase project. To meet financial goals, the bed count must increase with each phase of development. A new dining facility will increase the seat count for all-you-care-to-eat dining, including a cafe + market, and a student center activity-oriented space. The project includes a new regional utility plant, underground utility distribution, and considers rerouting a campus street. Phases anticipated: Phase 1 - construct approximately 1,500 beds Phase 2 - demolish one residence hall, the West Dunn Building, and construct approximately 750 beds and the dining hall/student center space Phase 3 - demolish remaining buildings, construct approximately 750 beds Each phase of the project will target LEED Silver or better. Detailed Sustainability goals are being developed and will be provided to the selected design team during the Master Planning/Advanced Planning phases. The method of Contractor Selection has not been Determined at this time.
Conceptual
Educational
$870,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed