BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2025 at 8:00 PM

Updated July 31, 2025

Renovation of a municipal facility in Johnstown, Pennsylvania. Working plans call for the renovation of a municipal facility.

Generator Installation for the Upper Yoder Township Municipal Building Three Copies of the Bid Sheet must be accompanied by a certified check, made payable to Upper Yoder Township, in the amount of ten (10%) percent of the bid amount. The sum will serve as bid security and will be retained by the Township as liquidated damages in the event that the Bidder withdraws from the competition after the bids have been opened, or refuses to execute the required contracts and Bonds, if its Bid is accepted. The Township may retain the amount of the certified check, or proceed on the Bid Bond. The bid security will be returned to the successful bidder, when it meets these requirements, and will be returned to all other bidders when its bids are rejected. The Township reserves the right to hold all bids for sixty (60) days after their opening and to accept or reject any and all bids during said sixty (60) day period and during said period; no bidder may withdraw its bid. The Township also reserves the right to waive any technicalities. ***As of July 30, 2025*** There were no bids received on the project. The Township is going to revisit the scope of work. They are thinking about not doing the whole building but, just the police department. They have not decided when the new BDT will be.

Final Planning

Municipal

$123,988.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
133
Bidding Soon
1,244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 29, 2025

Project location map

110 Sunray Dr, Johnstown, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.