Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Renovation of a mixed-use development in Exton, Pennsylvania. Completed plans call for the renovation of a educational facility.
Contractor will provide all necessary labor, materials and equipment to perform the following: 1. Supply and install one (1) new 80kw natural gas generator with the following options: standby 80kW natural gas generator, 208/120 volts, three-phase, 4-wire 60Hz, 1800 RPM one (1) 300amp Circuit Breaker, 3-pole, 600-volt AC, 80% UL 1" flexible fuel line and strainer Aluminum sound attenuated enclosure Deep Sea controller Battery charger w/rack and cables 2-year Base Warranty Operation & maintenance manuals 2. Supply and install one (1) new ASCO 400amp, 208/120-volt, 3-phase, 4-wire,3-pole, open-transition, Automatic Transfer Switch in a NEMA 3R enclosure with the following options: Source available lights Manual by-pass of transfer Automatic engine exerciser ATS position indicating contacts Heater w/ thermostat 3. Install the new ATS on the exterior of the building near the generator location. 4. Intercept the existing circuit feeding panels KP-1 and KP-2 and extend to the new ATS. 5. Supply and install new line and load conduits and cables from the KP-1 panel to the new ATS. 6. Supply and install new conduits and cables from the ATS to the generator as required. 7. Supply and install one (1) new conduit and cables from panel KP-1 to the generator for the block heater and battery charger circuits. 8. Supply and install new gas piping, valves and pressure regulator as required to extend the existing gas line to the new generator. 9. Provide the necessary crane and rigging to install the new generator. 10. Perform start up and commissioning on he newly installed equipment. Questions Due Date: Jun 6th 2025, 12:00 PM EDT
Award
Educational
$92,145.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
July 14, 2025
Multiple Locations, Exton, PA
Related To This Project
Exton, PA
Bid Date: Jul 02 2025
Exton, PA
Bid Date: Aug 18 2025
Exton, PA
Bid Date: Sep 05 2025
Exton, PA
Bid Date: Nov 04 2025
Exton, PA
Bid Date: Nov 25 2025
Exton, PA
Bid Date: Jan 27 2026
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jul 01 2025
Exton, PA
Bid Date: Jun 17 2025
Exton, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
