Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work for a bridge / tunnel in Fort Gibson, Oklahoma. Completed plans call for site work for a bridge / tunnel.

In general, this project consists of the following summarized components a. Demolition of the existing bridge pedestals, girders, beams, deck, sidewalks, guardrails, electrical power/lighting systems, utilities, catwalk, pier walls down to EL. 583 (as shown on drawings) and all appurtenances as indicated on the drawings, and Design, construction, and establishment of temporary electrical service to provide uninterrupted operation of all existing Government facilities and structures for the duration of the contract. Temporary electrical power, for operation of existing Government equipment and facilities only (tainter gates, lights, sump pump, lake offices, etc.), will be provided from the Fort Gibson powerhouse and paid for by the Government. The Contractor shall provide, condition, and pay for all power/electrical service and all other utilities necessary for construction equipment and facilities. The work is located at the Ft. Gibson Lake, Oklahoma, approximately as indicated on drawings. The exact location will be shown by the Contracting Officer. Small Business 16% of total contract dollars (aggregate of all small businesses participation including the small business socioeconomic contracting programs (i.e., 8(a), HUBZone, SDVOSB, or WOSB programs). Small Disadvantaged Business (SDB) 11% of total contract dollars Women-Owned Small Business (WOSB) 1% of total contract dollars Historically Underutilized Business Zones (HUBZone) 1% of total contract dollars Veteran-Owned Small Business (VOSB) 1% of total contract dollars Service-Disabled Veteran-Owned Small Business (SDVOSB) 1% of total contract dollars Question Deadline 09/19/2025 All contractual matters,questions and or comments relative to these documents should be submitted via Online. no laterthan 10 calendar days prior to the proposal due date, in order that they may begiven consideration or actions taken prior to receipt of offers. Fort Gibson Replace Spillway Bridge

Post-Bid

Bridges / Tunnels

$100,000,000.00

Public - Federal

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
73
Bidding Soon
1,209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2025

September 30, 2025

Project location map

Ft. Gibson Lake, Fort Gibson, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.