Site work for a road / highway in Fort Gibson, Oklahoma. Completed plans call for site work for a road / highway.
The project includes installing 10,906 linear feet of a 6-foot tall barbed wire chain link security fence around the perimeter of the port, excluding property directly abutting the water. Security gates at all exterior entrances and rail crossings are also to be installed. Each proposal must be accompanied by a Bidder's Bond, or Cashier's Check upon any solvent Bank or Trust Company, payable without reserve to the Muskogee City County Port Authority, in an amount not less than five percent (5%) of the total amount of the bid. The bonds required will be a Payment Bond, a Performance Bond, and a Maintenance Bond, each in the full amount of the contract. The Port will not accept letters of credit in lieu of any bond required herein. SUMMARY: A. This Section summarizes the Work covered in detail in the complete Contract Documents. B. Owner: The Muskogee City County Port Authority is contracting for Work described in the Contract Documents. 1. 2. Contract Identification: Port Muskogee Security Fence Work Site Location: Port Muskogee, Oklahoma C. Engineer: The Contract Documents were prepared by Burns & McDonnell Engineering Company, Inc., 1317 Executive Blvd., Suite 300, Chesapeake, Virginia 23320. PROJECT DESCRIPTION: A. Description of Project: Port Muskogee Security Fence B. Work Covered by Contract Documents: Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work under this Contract is generally described as installing a barbed wire chain link security fence around the perimeter of the port, excluding property directly abutting the water. Security gates at all exterior entrances and rail crossings are also to be installed CONTRACTOR'S USE OF PREMISES: A. Limited Use: 1. Limit use of the premises for storage and execution of the Work to allow for work by other contractors and for Owner occupancy. Confine operations to areas within Contract limits indicated. Portions of Site outside the Contract limits shall not be disturbed. 2. 3. Coordinate with other separate contractors and Owner to avoid interference of operations. Conduct operations so as to ensure the least inconvenience to Owner and the general public. OWNER'S USE OF PREMISES: A. Full Owner Occupancy: The Owner will occupy the Site and existing building during the entire construction period. Cooperate with the Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with the Owner's operations. WORK SEQUENCE: A. General: Construction sequence shall be determined by Contractor subject to Owner's need for continuous operation of existing facilities. B. Continuous Service of Existing Facilities: Exercise caution and schedule operations to ensure that functioning of present facilities will not be disrupted. Shutdown of Owner's operating facilities to perform the Work shall be held to a minimum length of time and shall be coordinated with Owner who shall have control over the timing and schedules of such shutdowns. C. Substantially Completed Areas: Owner intends to place in service, in accordance with the provisions for use of completed Work set forth in the GENERAL CONDITIONS, the completed areas or facilities as soon as they are Substantially Complete and ready for their intended use.
Award
Roads / Highways
$633,767.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
August 7, 2025
Multiple Locations, Fort Gibson, OK
Related To This Project
Fort Gibson, OK
Bid Date: Aug 07 2025
Fort Gibson, OK
Bid Date: Oct 02 2025
Fort Gibson, OK
Bid Date: Dec 16 2025
Fort Gibson, OK
--
Fort Gibson, OK
Bid Date: Dec 18 2025
Fort Gibson, OK
Bid Date: Jun 30 2025
Fort Gibson, OK
Bid Date: Sep 29 2025
Fort Gibson, OK
Bid Date: Jun 24 2025
Fort Gibson, OK
Bid Date: May 27 2025
Fort Gibson, OK
Bid Date: Apr 17 2025
Fort Gibson, OK
Bid Date: Mar 27 2025
Fort Gibson, OK
Bid Date: Mar 10 2025
Fort Gibson, OK
Bid Date: Feb 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.