Site work for a bridge / tunnel in Fort Gibson, Oklahoma. Completed plans call for site work for a bridge / tunnel.
In general, this project consists of the following summarized components a. Demolition of the existing bridge pedestals, girders, beams, deck, sidewalks, guardrails, electrical power/lighting systems, utilities, catwalk, pier walls down to EL. 583 (as shown on drawings) and all appurtenances as indicated on the drawings, and Design, construction, and establishment of temporary electrical service to provide uninterrupted operation of all existing Government facilities and structures for the duration of the contract. Temporary electrical power, for operation of existing Government equipment and facilities only (tainter gates, lights, sump pump, lake offices, etc.), will be provided from the Fort Gibson powerhouse and paid for by the Government. The Contractor shall provide, condition, and pay for all power/electrical service and all other utilities necessary for construction equipment and facilities. The work is located at the Ft. Gibson Lake, Oklahoma, approximately as indicated on drawings. The exact location will be shown by the Contracting Officer. Small Business 16% of total contract dollars (aggregate of all small businesses participation including the small business socioeconomic contracting programs (i.e., 8(a), HUBZone, SDVOSB, or WOSB programs). Small Disadvantaged Business (SDB) 11% of total contract dollars Women-Owned Small Business (WOSB) 1% of total contract dollars Historically Underutilized Business Zones (HUBZone) 1% of total contract dollars Veteran-Owned Small Business (VOSB) 1% of total contract dollars Service-Disabled Veteran-Owned Small Business (SDVOSB) 1% of total contract dollars Question Deadline 09/19/2025 All contractual matters,questions and or comments relative to these documents should be submitted via Online. no laterthan 10 calendar days prior to the proposal due date, in order that they may begiven consideration or actions taken prior to receipt of offers. Fort Gibson Replace Spillway Bridge
Post-Bid
Bridges / Tunnels
$100,000,000.00
Public - Federal
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2025
September 30, 2025
Ft. Gibson Lake, Fort Gibson, OK
Related To This Project
Fort Gibson, OK
Bid Date: Jun 30 2025
Fort Gibson, OK
Bid Date: Dec 18 2025
Fort Gibson, OK
Bid Date: Jul 23 2025
Fort Gibson, OK
Bid Date: Aug 07 2025
Fort Gibson, OK
Bid Date: Oct 02 2025
Fort Gibson, OK
Bid Date: Dec 16 2025
Fort Gibson, OK
--
Fort Gibson, OK
Bid Date: Jun 24 2025
Fort Gibson, OK
Bid Date: May 27 2025
Fort Gibson, OK
Bid Date: Apr 17 2025
Fort Gibson, OK
Bid Date: Mar 27 2025
Fort Gibson, OK
Bid Date: Mar 10 2025
Fort Gibson, OK
Bid Date: Feb 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.