Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2025 at 8:00 PM
Updated June 25, 2025
Site work and paving for a sidewalk / parking lot in Lombard, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Description: Construction of variable area resurfacing w/HMA Surface Course, Mix D, N50 (2,500 TON, incl. 10,048 LB Bit Material (Tack Coat), 726 SF PCC Sidewalk 5", 403 FT Comb. C&G Remove & Replace, 1 LS Traffic Control, various quantities of Thermoplastic Pavement Marking-Line 4". No Pre-Bid Meeting will be held Site Directions: Various parking lots throughout the Village of Lombard. Maps are included within the contract document. Est. Completion Date: Sept. 19, 2025 Est. Value Notes: 300,000 - 400,000 The Contractor shall be sufficiently experienced with municipal HMA parking lot construction/rehabilitation, having completed at least three projects of similar scope (contract having a minimum value of $50,000) within the past five years. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The proposed work is officially known as "FY 2025 COMMUTER PARKING LOT" and consists of HMA Surface Removal, 2" HMA Surface Course, spot Combination Concrete Curb & Gutter Removal and Replacement and Thermoplastic Pavement Markings at 8 parking lots located throughout the Village: 4 Park District lots, 4 Village lots and Holomon Drive. 104.01 Intent of the Contract. Add the following at the end of this Section: Any work not specified on the plans or herein which may be implied as being included in this Contract, ofwhich the Engineer shall be the judge, shall be done by the Contractor without extra charge. Question Deadline 06/09/2025 at 12:00 PM CT
Bid Results
Sidewalks / Parking Lot
$477,297.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 16, 2025
July 16, 2025
Multiple Locations, Lombard, IL
Related To This Project
Lombard, IL
Bid Date: Aug 15 2025
Lombard, IL
Bid Date: Oct 21 2025
Lombard, IL
Bid Date: Oct 21 2025
Lombard, IL
Bid Date: Oct 22 2025
Lombard, IL
Bid Date: Nov 06 2025
Lombard, IL
Bid Date: Nov 24 2025
Lombard, IL
Bid Date: May 23 2025
Lombard, IL
Bid Date: May 05 2025
Lombard, IL
Bid Date: May 14 2025
Lombard, IL
Bid Date: Apr 17 2025
Lombard, IL
Bid Date: Sep 19 2025
Lombard, IL
Bid Date: Apr 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
